Traffic

Extra I-66 Lane Expected to Open Tonight

A third “auxiliary” lane will open tonight on westbound I-66, between Fairfax Drive and Sycamore Street.

The lane was built as part of a 18 month, $14 million VDOT “spot improvement” project. Gov. Bob McDonnell (R) is touting the lane opening as a relief for drivers who face frequent heavy delays on that stretch of highway.

From a press release, issued this afternoon:

By 7 p.m. tonight, motorists will have some much-needed congestion relief on westbound I-66 between Fairfax Drive and Sycamore Street in Arlington County with the opening a two-mile auxiliary lane.  It is the first of three spot improvements designed to reduce congestion and increase safety on westbound Interstate 66 inside the Beltway, according to the Virginia Department of Transportation.

“Our Administration is focused on helping Virginians spend more time at work and with their families, and less time stuck in traffic,” said Governor McDonnell.  “This spot improvement is another step forward in that effort. When it opens this evening, all motorists heading west out of Arlington will find a slightly smoother commute, and hopefully gain a little more time off the road. Through improvements like this one we are continuing to make progress in getting traffic moving again in the Commonwealth.”

The westbound acceleration and deceleration lane between Fairfax Drive and Sycamore Street has been lengthened to form a continuous auxiliary lane between the two ramps. The improvement includes a new 12-foot wide shoulder constructed with full-strength pavement so that it is capable of carrying traffic during emergency situations. The $14 million improvement took 18 months to complete.

Future spot improvements, not part of this contract, are planned from Haycock Road to Westmoreland Street, and from Lee Highway to Glebe Road. These next phases of spot improvements will reduce congestion and travel times during peak periods, and increase safety by lengthening merge areas and reducing the risk of stop-and-go accidents.

The estimated cost for the second and third spot improvement projects is $49.6 million. These will be funded after the I-66 multimodal study is completed next year.

Author

  • Launched in January 2010, ARLnow.com is the place for the latest news, views and things to do around Arlington, Virginia. Started by a Pentagon City resident who has spent the past several years working in local TV news, ARLnow.com seeks to distinguish itself with original, enterprising, up-to-the-minute local coverage.

    View all posts