Traffic

Nighttime Paving on Crystal Drive to End Tonight

Some Crystal City residents say they’re fed up with nighttime paving on Crystal Drive that they claim has kept them from sleeping.

Roadwork on Crystal Drive should end tonight, which is ahead of schedule, said county spokeswoman Jessica Baxter, adding that the original timeframe had paving and milling continuing for several weeks.

“We apologize for the inconvenience, but this is important work that needs to get done. The end result will be a smooth, durable pavement that all roadway users will enjoy,” Baxter said.

Crystal Drive was on the county’s schedule for paving this year, and it needed to be completed so the county could finish the Crystal City-Potomac Yard Transitway. Milling began last Friday, Oct. 9 at 9 a.m., but the majority of the paving was done at night in order to reduce traffic disruptions during the work day, she said.

“Milling tends to be noisier, which is why we scheduled it during the day to reduce the impacts in residential areas,” Baxter said. “The majority of paving, however, is taking place at night between 7 p.m. to 5 a.m. to minimize traffic impacts, maximize pedestrian safety and to expedite the work.”

Some Crystal City residents claimed that the paving noise was loud enough to keep them awake throughout the night, taking to Twitter to voice their frustrations.

The noise was loud enough to be heard through earbuds, said one resident who asked that we redact his name after the publication of this article.

“Why would the County approve night time road work along a road with residential buildings with hundreds of residents? Even with ear plugs, it was extremely difficult to sleep, and I’m sure other residents along Crystal Drive had a difficult time as well,” the resident said.

While the county tried to minimize the disruptions to the flow of traffic, the resident said in an email that the road conditions were hazardous to drivers and pedestrians due to “an unmarked work zone (no cones, no police, no barriers, nadda).”

“On Saturday, with no Arlington County police officers present and no workers directing traffic, pedestrians and vehicles engaged in a game of Frogger — dodging workers, raised manhole covers and work vehicles and equipment on the unmarked road,” he said. “Throughout the day, there were a few near misses as work vehicles moved about and backed up in and around passing cars and crossing pedestrians.”

Arlington warned people living in Crystal Drive residences that there would be nighttime roadwork, Baxter said.

“We sent out notifications through the Crystal City-Pentagon City e-newsletter, the Crystal City Civic Association and BID, as well as to contacts at residential and office buildings,” she said. “In all of our communication, we shared that nighttime work should be expected.”

Author