News

Van Buren Bridge to Close for Several Months

Starting in October, a construction project will close the Van Buren Bridge near the East Falls Church Metro until next spring.

The bridge expansion and replacement project is scheduled to begin the week of October 16, and all bridge access will end at that time. In a letter to residents, the City of Falls Church indicated that construction is expected to continue at least through March 2018.

During construction, Van Buren Street will be closed between 19th Street North in Arlington and East Columbia Street in Falls Church. Northbound vehicles will be rerouted from Columbia Street to Roosevelt Street and 19th Street North. Southbound vehicles will be rerouted from 19th Street North to Sycamore Street and 16th Street North. Cyclists and pedestrians will detour on an existing bridge along the W&OD trail in Benjamin Banneker Park.

Construction is expected to take place most weekdays from 7:00 a.m. to 5:00 p.m., and some weekend work may also be necessary. Residents in the affected area will still have access to their driveways and homes when the closure is in effect.

The project to remove and rebuild the existing Van Buren Bridge will repair structural deficiencies and add pedestrian access along the corridor to the East Falls Church Metro. The new bridge will have two lanes for vehicle traffic and cyclists in addition to a 12-foot wide pedestrian walkway.

Author