Arlington Public Schools plans to add solar panels to five school buildings, including the soon-to-be-built Alice West Fleet Elementary School.
APS issued a Request for Proposals on December 1, calling for companies to bid to install solar panels at Kenmore and Thomas Jefferson Middle Schools, Tuckahoe and Fleet Elementary Schools and Washington-Lee High School.
Fleet Elementary School will be built on the site of Thomas Jefferson, and is projected to be open in September 2019.
In the call for proposals, APS said it is seeking to be increasingly environmentally friendly in construction projects and its existing buildings, and hopes the panels will help it keep up with its schools’ energy demands.
“APS stresses energy efficiency and environmental sustainability in the design of all construction and maintenance projects,” it reads. “APS is aware of the energy and environmental advantages of solar power and has multiple buildings used as schools for all age groups and administrative offices which appear to have design characteristics which make them appropriate for the installation of [solar panels] which will produce electric power to meet, or contribute to meeting, the power needs of APS.”
The successful bidder would install the solar panels, and operate and maintain them under a lease agreement with APS for a minimum of 15 years. APS said the winning company would also be responsible for all installation and maintenance costs, but would pay rent of $1 a year for the panels.
Proposals are due on March 19, 2018. The RFP comes months after Kenmore was one of six sites in Virginia selected to have a solar panel installed on its roof as part of the Solar for Students program, which encourages hands-on learning about clean energy.