News

Renderings Show Luxury Amenities for New Rosslyn Condos

(Updated at 3:40 p.m.) New renderings show one of the three luxury condo buildings being built in Rosslyn.

The Pierce is part of the Highlands development of three high-rise housing buildings on 1555 Wilson Blvd, which is slated to include 884 luxury housing units and 40,000 square feet of retail space when it’s completed.

At 27 stories tall, the Pierce will include a total of 104 one-, two-, and three-bedroom condominium residences, according to a spokeswoman for the developer Penzance. The size of the units range between 1,266 to 2,403 square feet.

The project originally faced opposition for replacing what was once recreational space and Arlington Fire Station 10. In exchange, Penzance pledged to build a new fire station on the ground floor of the new development, along with a landscaped public plaza and an extension of N. Pierce Street to 18th Street — a deal the county accepted in 2016.

A new 360-tour using renderings of the luxury units in the Pierce building show 10-foot ceilings, quartz countertops, and windows facing the Potomac or Rosslyn. A spokeswoman added that bathrooms in the units will have heated floors.

Other renderings show such building amenities as a gym, pool, and rooftop space for residents. In total, the building offers 2,250 square feet of outdoor amenity space, and an additional 8,600 square feet of shared amenity space when you include the rooftop pool in the adjacent Evo building.

The project recently generated some controversy after the developer asked the County Board to extend permitted construction hours by one hour in the mornings, to 6 a.m. on weekdays and 8 a.m. weekends, through the end of the year. The developer previously said the project is slated to finish in 2021.

Some in the area are unhappy with the proposed extended hours.

“This will be disruptive to all in the area, including businesses, residents, and the already increasing traffic issues,” one tipster told ARLnow. “I also want to note that this is yet another time Arlington County Board shows a disregard for the community in the area.”

The County Board is scheduled to vote on the new hours during a meeting this Saturday. The item is currently included in the meeting’s consent agenda, which is typically reserved for matters expected to pass without debate.

Images courtesy of Neoscape

Author