(Updated at 1:25 p.m.) Arlington County firefighters and paramedics helped to rescue an injured construction worker from one of the top floors of an unfinished office building in Ballston.
A large piece of glass reportedly fell on a worker on the 9th floor of the construction site at 800 N. Glebe Road around 12:30 p.m. Rescuers were apparently able to get the man down several flights of narrow stairs before loading him on to the basket of a ladder truck five floors below. The ladder was then lowered down to ground level as bystanders watched from across the street.
The man’s injuries were not said to be life-threatening.