News

Pike Library to Be Modernized, Downsized As Part of ‘Arlington Tech’ Expansion

The Arlington County Board is set to consider a school expansion project that will involve changes to a local library.

Arlington Public Schools is requesting a use permit to add 150 seats to its Arlington Tech program at the Arlington Career Center. It’s the prelude to a larger expansion project for the facility at 816 S. Walter Reed Drive, which would add 800 new high school seats and a 200,000 square foot addition by 2025.

The current project would add the new student capacity — bringing the total Arlington Tech seats from 350 to 500 — via interior changes, namely the use of what is currently the second floor of the Columbia Pike Branch Library. The library, in turn, would be modernized consolidated on the first floor of the building.

“Both floors of the existing Columbia Pike Branch Library will be renovated, with the second floor converted to classroom space for APS use during school hours and County use outside school hours,” a county staff report says. “There are no proposed changes to the façade of the building.”

If approved, Construction is expected to kick off in July or August and run through late fall. The library would be closed for 3-4 months, prompting some concerns from nearby residents.

“The Arlington Heights Civic Association expressed their concerns regarding the closure of the library during the renovations,” the staff report notes. “Residents will be able to access other full-service libraries to use the same services offered at this location, including the Shirlington, Aurora Hills and Glencarlyn branches, as well as the use of public computers at the nearby Walter Reed Community Center.”

The item at the end of the agenda for the Board’s meeting this coming Saturday.

More from the county staff report:

The Board will consider Arlington Public Schools’ request for an amendment to its Use Permit for the Arlington Career Center, located at 816 S. Walter Reed Drive. If approved, the amendment would allow APS to add 150 seats for the Arlington Tech high school program through interior renovations that would include renovating both floors of the Columbia Pike Branch Library. The number of seats at the Career Center would be increased from 800 to 950. The plan calls for converting the library’s second floor to classroom space during school hours and County use outside school hours. The modernized library would be consolidated on the first floor. During the anticipated three to four months of renovations, the library would be closed. If the plan is approved, APS expects to begin construction in July or August 2020 and finish in late fall. To read the staff report, scroll to Item No. 34. on the agenda.

As a result of the renovations, the total ACC building capacity will increase from 800 seats to 950 seats. With its existing functions consolidated to the first floor, the library will be modernized with new technology, furniture, and equipment that improves the delivery of current resources and programs. During the renovations, which are anticipated to last for approximately three (3) to four (4) months, the library and its programs and services will be closed. Due to financial costs and the short-term nature of the closure, there are no plans to set up a temporary library location. However, residents will be able to access other full-service libraries to use the same services provided at this branch, including the Shirlington, Aurora Hills and Glencarlyn branches, as well as the use of public computers at the nearby Walter Reed Community Center.

While the renovations were initially intended to occur during the 2020 summer break and completed in time for the 2020-21 school year, due to the uncertainty related to Coronavirus Disease 2019 (COVID-19) the planned renovations have been delayed with an anticipated construction start date of July/August 2020. APS intends to proceed with the renovations as soon as reasonable in coordination with pandemic recovery. In the interim, to accommodate the growing enrollment at Arlington Tech, APS is pursuing alternatives over the 2020 summer break to increase seat capacity including minor interior renovations to add a new science lab and rightsize existing classrooms, as well as the temporary installation of eight (8) additional relocatables on the existing parking lot.

Author

  • Launched in January 2010, ARLnow.com is the place for the latest news, views and things to do around Arlington, Virginia. Started by a Pentagon City resident who has spent the past several years working in local TV news, ARLnow.com seeks to distinguish itself with original, enterprising, up-to-the-minute local coverage.

    View all posts