News

County Board to Consider Three Park Renovation Projects

Three Arlington County parks — Thomas Jefferson Park, Towers Park and Marcey Road Park — could see substantial upgrades over the next year.

Contracts to improve the amenities at these three facilities are teed up for County Board approval this Saturday. The projects were all approved in the summer of 2018 as part of the 2019-2028 Capital Improvement Plan.

If passed, the natural-grass upper field at the Thomas Jefferson Park (3501 2nd Street S.), which hosts the Arlington County Fair, will be redone with synthetic turf.

As part of the $1.1 million project, the field will get spectator seating, signage, site furnishings and new landscaping, as well as athletic equipment and a long jump area. There will be accessibility and stormwater management improvements. The field’s existing lighting will remain.

“The conversion should not impact the County Fair if it remains at TJ,” Department of Parks and Recreation spokeswoman Susan Kalish said. “The County is looking into investing in a turf cover to protect the field at TJ and possibly at other synthetic turf fields.”

But Arlington County Fair organizers are considering moving the event to Long Bridge Park.

During community outreach about the turf project, conducted in the winter of 2019-20, residents indicated “a strong desire to keep the County Fair at Thomas Jefferson Park,” according to a staff report. The county is once more accepting feedback on the potential move.

In the report, the parks department responded to safety concerns about synthetic turf and pointed to Arlington County Public Health’s Synthetic Turf FAQ.

“At this time, all independent studies report that ‘the preponderance of evidence shows no negative health effects associated with crumb rubber in synthetic turf,'” the report said.

Construction would take about six months.

Over at Towers Park, at 801 S. Scott Street near Columbia Pike, the existing playground for 2 to 5-year-olds, last replaced in 2000, would be razed. A new playground for 2 to 5-year-olds and another for 5 to 12-year-olds will be installed elsewhere, as the current structure falls in a resource protection area that will be reforested.

If approved, that project could start in the fourth quarter of 2021 and finish in the second quarter of 2022. There will be stormwater management work and new walkways, fencing, signage, site furnishings and landscaping.

The project was delayed by the pandemic and over-budget bids, per a board report. After a first round of bids came back too high, the report said DPR “value-engineered the play equipment selection” and rebid the project this June. All the bids were still over-budget, but the county negotiated the lowest bid to $825,000.

Finally, at Marcey Road Park, located 2722 N. Marcey Road near Military Road, the basketball court, the three tennis courts, the parking lot and picnic shelter will be replaced. The park will get new LED court lighting and furnishings, as well as drainage, stormwater management and landscaping work.

“The outdoor amenities for this park are past their life expectancy and are in need of replacement,” a county report said. “Community feedback indicated the desire for more seating opportunities and trash receptacles, a larger basketball court, a larger picnic area with shade, improved tennis court practice wall, improved accessibility and preservation of as many trees as possible.”

Every bid was over-budget, and the lowest was a non-negotiable $1.3 million, the report said. That project is expected to start in the fourth quarter of 2021 and finish in the third quarter of 2022.

Author