News

Crystal Drive Pedestrian Bridge To Be Removed

Pedestrian bridge over Crystal Drive (photo via Google Maps)

The pedestrian bridge over Crystal Drive at 20th Street S. is set to close Monday, in advance of being removed permanently.

The bridge, which connects to the 220 Twentieth Street apartment building, is being removed to bring the prior redevelopment of the building “in line with the County Board’s policy of removing above street-level pedestrian circulation in order to focus such activity on the existing exterior sidewalks, thereby creating a busier, more active, and exciting streetscape,” according to the Crystal City Business Improvement District.

Rendering of Crystal Drive pedestrian bridge removalThe major demolition work will be completed Aug. 10 and 11, according to Vornado Vice President for Development Gordon Fraley. Vornado is coordinating and funding the demolition as the owner of the 220 Twentieth Street building.

After the bridge is taken down, it will clear the way for a planned “pocket park” in the area and a new stair/escalator to the Crystal Drive shops and restaurants from the upper plaza, the BID says on its website.

Photo (top) via Google Maps. Photo (bottom) via Crystal City BID.

Author