(Updated 2 p.m.) Some changes are coming to several Metrobus routes through Arlington County next year, as the county prepares for the Columbia Pike “Premium Transit Network.”

At a work session with the Arlington County Board on Thursday, county staff put forward a plan that would end seven lines that run through Arlington in FY 2019, which begins on July 1, 2018, and save the county $5.8 million:

  • The 4A between Seven Corners and Rosslyn
  • The 16B, E and P along Columbia Pike
  • The 16G, H, K along Columbia Pike

A spokesman for the county’s Department of Environmental Services said the changes along the Pike would help make way for the so-called “Premium Transit Network,” which is projected to cost $6.9 million and launch next summer after delays. The various routes would be consolidated under that network, which the spokesman said would “result in more bus service in the county, not less.”

The new bus system was put together after the Columbia Pike Streetcar project was cancelled in 2014, with Board members at the time promising a system that would be just as good, if not better.

To try and lessen the impact of the service cuts, staff proposed improving the frequency and hours of the 4B that largely overlaps the 4A, and similar efforts for the 16A on Columbia Pike. Those improvements would cost just under $850,000.

The 4B would then be discontinued as a Metrobus route in FY 2020, saving the county $1.7 million, and made an ART route.

The 16X service from Columbia Pike to Federal Triangle in D.C. via the Pentagon would have its hours improved, at a cost of $3.2 million to county coffers. The 15K and 15L routes between the East Falls Church and Rosslyn Metro stations would also be realigned.

All told, the various service reductions and increases will cost the county just over $2.6 million more in its Metrobus subsidy, bringing that figure to $40.5 million in FY 2019.

The possibility also exists that the 22A, B and C routes through Barcroft and South Fairlington could be converted into locally-run ART routes. That would save $2.4 million in the county’s Metrobus subsidy, but would require funds to be made available through ART instead.

Cuts had been planned for FY 2018 under the county’s Transit Development Plan approved last year, but were pushed off to FY 2019. The county did not cut any Metrobus routes for FY 2018, and improved the frequency of the 2A route between the Ballston and Dunn Loring Metro stations.

That came in part due to funding from the Virginia Department of Transportation’s “Transform 66” project to widen I-66 from the Dulles Connector Road to the Fairfax Drive exit in Ballston.

Metro staff will analyze the actual costs and savings from the various changes, and bring forward a proposal to the agency’s board of directors. The board would then take public comment on any proposed changes region-wide before making a decision next year.

Image via county staff presentation


Someone phoned in a bomb threat to the county’s Emergency Communications Center in Courthouse yesterday morning.

The threat was made just before 9 a.m. on July 5. It prompted a sweep of the building, which houses the Arlington County Police Department’s headquarters and the local courts. No explosives were found.

A similar threat was made last September on police headquarters. No explosives were found that time either.

From an ACPD crime report:

BOMB THREAT, 2017-07050054, 1400 block of N. Courthouse Road. At approximately 8:57 a.m. on July 5, an anonymous subject called in and stated there was a bomb in the building. Multiple units responded to the scene and conducted a search for a device with negative results.


Arlington County is under a flash flood watch until 7 p.m. tonight, with the rest of the D.C. metropolitan area.

The National Weather Service said between one and three inches of rain are possible, with multiple rounds of rainfall throughout the day. More showers are expected this afternoon, and thunderstorms may also hit the region.

NWS advises that those living near rivers, streams and creeks should watch water levels during heavy rain.

Update at 5:55 p.m. — The Flash Flood Watch was extended until 2 a.m.


A plan to revamp Interstate 66 is threatening the character of the Custis Memorial Parkway, the highway’s name inside the Capital Beltway, historic preservation advocates said today (Wednesday).

Preservation Arlington, a nonprofit group that looks to protect Arlington’s architectural heritage, released its annual list of “endangered historic places,” with the parkway named as one.

The Virginia Department of Transportation is in the midst of an ambitious plan known as “Transform 66” to widen I-66 from the Dulles Connector Road to the Fairfax Drive exit in Ballston within the existing eastbound right-of-way.

Under the plan, VDOT would also add tolls and improve local trails, as well as build a pedestrian bridge in East Falls Church.

But Preservation Arlington said the plan could undermine “the roadway’s unique parkway design.”

“Plantings are no longer maintained. Corten steel guardrails and sign supports are being replaced with standard, steel interstate highway components,” the group wrote. “The new toll road gantries, and large, new sign supports (and highway signage) on nearby arterial roads have further eroded the parkway’s ability to blend into its surroundings.”

Another piece of history under threat, according to Preservation Arlington, are the Education Center and Planetarium, chosen last week by the Arlington County School Board for an extra 500-600 high school seats and a renovation.

A request had been made to designate the site as a historic district, but the County Board followed staff’s recommendation and denied that designation in May.

“While some exterior improvements will be necessary it is hoped that this will be minimal and will not alter the appearance of the historic structure,” Preservation Arlington wrote. “Designed as a headquarters building to show the strength and commitment to education, the building is iconic in our community.”

Also under threat, according to Preservation Arlington:

  • 1000-series Metro cars, retired this month for safety reasons
  • Community buildings like those for churches and service organizations
  • Four Mile Run industrial area
  • Housing stock from before World War II, with the continued loss of these homes “erasing Arlington’s architectural and community history.”

Image via VDOT presentation


Someone broke into a business on N. Glebe Road in Ballston over the weekend and stole items of value, Arlington police said in a crime report.

Police said the burglar broke into the building on the 600 block of N. Glebe Road at some point between 11 a.m. July 1 and 7 a.m. July 3. Officers have no description of the suspect.

A police spokesman declined to specify which business was robbed. The block is home to a Harris Teeter grocery store, a Mercedes-Benz car dealership and an auto repair shop.

More from this week’s Arlington County Police Department report:

BURGLARY, 2017-07030047, 600 block of N. Glebe Road. At approximately 7:26 a.m. on July 3, officers responded to the report of a burglary. Upon arrival, it was determined between 11:00 a.m. on July 1 and 7:00 a.m. on July 3, an unknown subject(s) forced entry into a building and stole items of value. There is no subject(s) description.

The rest of this past week’s crime report highlights, including some that we’ve already reported, after the jump.

(more…)


Controversial renovations to a baseball field at Bluemont Park are now over, as that area of the park reopened last week and is set to celebrate Saturday with a ribbon-cutting ceremony.

The project at the 601 N. Manchester Street park brought a full replacement of one of its baseball fields, as well as the installation of a connector on the Four Mile Run Trail to N. Manchester Street and Ashlawn Elementary School.

The renovated field got new sod, irrigation, site circulation, fencing, backstops, bleachers, furniture, signage, ADA accessibility improvements and drainage. It officially reopened for use on Friday, June 30.

Neighbors fought against the plan to renovate the baseball field, and met with youth baseball and softball boosters last year for a county-organized “listening session” so each side could have its say. Those in favor of the plan said it would make the field more playable and help keep up with demand as the number of children playing youth baseball continues to rise.

Residents raised concerns about the field being fenced in, and a compromise was reached as the county agreed to remove about 20 percent of the fencing. County Manager Mark Schwartz added at the time that Arlington must reconsider its public outreach on such projects, after opponents said that they were blindsided by the plan.

Saturday’s ribbon-cutting ceremony will include a presentation of colors by the Arlington County Joint Honor Guard and the singing of the National Anthem as well as remarks by County Board members and the community. It begins at 11 a.m.


Police responded twice on Sunday to two separate reports of indecent exposure and arrested one man, but do not believe the two are linked.

Police were called to the 4100 block of N. Henderson Road in Buckingham just before 1 p.m. after reports a man exposed himself to a woman. The suspect, described as a black male in his early thirties, between 5-foot-10 and 6 feet tall, weighing 180-190 pounds and wearing a white shirt and khaki pants, is still at large.

That same day at around 8:10 p.m., police arrested a 43-year-old man for indecent exposure after he allegedly exposed himself to several victims on the 100 block of S. Old Glebe Road in Arlington Heights.

A police spokesman said that investigators “do not believe” the two offenses are related. They follow a spate of similar flashing incidents in Arlington over the past few weeks. Police arrested a man last week for exposing himself to multiple people in the Ballston area.

More from a crime report by Arlington police:

INDECENT EXPOSURE, 2017-07020189, 100 block of S. Old Glebe Road. At approximately 8:10 p.m. on July 2, officers responded to the report of an indecent exposure. Upon arrival, it was determined a male suspect exposed himself to several victims. Alexei Cordero Rodriguez, 43, of no fixed address, was arrested and charged with indecent exposure.

INDECENT EXPOSURE, 2017-07020105, 4100 block of Henderson Road. At approximately 12:55 p.m. on July 2, officers responded to the report of an indecent exposure. Upon arrival, it was determined an unknown male subject exposed himself to a female victim. The subject is described as a black male in his early thirties, approximately 5’10”-6’0″ tall and weighed 180-190 lbs. He was wearing a white shirt and khaki pants. The investigation is ongoing.


Update at 3:05 p.m. – Arlington is now under a severe thunderstorm warning until 3:45 p.m.

More from the National Weather Service:

At 259 PM EDT, a severe thunderstorm was located over Reston, moving east at 35 mph.

HAZARD…60 mph wind gusts.

SOURCE…Radar indicated.

IMPACT…Damaging winds will cause some trees and large branches to fall. This could injure those outdoors, as well as damage homes and vehicles. Roadways may become blocked by downed trees. Localized power outages are possible. Unsecured light objects may become projectiles.

Earlier: The National Weather Service issued a severe thunderstorm watch for Arlington County, in effect until 9 p.m. tonight.

The watch spreads across an area covering six states on the East Coast. NWS warns of isolated hailstones the size of ping pong balls, wind gusts up to 70 mph and frequent lightning.


It’s been another busy week in Arlington, even as the county prepares for next week’s Independence Day celebrations.

Here are our five most popular stories from this week:

  1. Dozens of Dirt Bikes, ATV Rumbled Past Crystal City Last Night
  2. BREAKING: Man Pinned Under Collapsed Wall
  3. Expert: Arlington Home Values Have Largely Rebounded Since 2008 Crisis
  4. BREAKING: ART Bus Rolls Into SUV, Yard in Nauck
  5. Continental Beer Garden To Open Tomorrow In Rosslyn

Feel free to discuss those topics or anything else of local interest in the comments. And never fear, we’ll be back on Monday. Have a great weekend!


County Manager Mark Schwartz announced Friday he is recommending lights for two synthetic turf fields near Williamsburg Middle School and Discovery Elementary School.

Schwartz recommended that the two fields be lit with shielded LED lights that could be dimmed during evening play, and that lights be left on no later than 9:45 p.m. Eighty-four lights would be installed on six 80-foot poles to light the fields.

Schwartz said in a statement:

I appreciate the hard work that the Williamsburg Fields Evaluation Work Group put into assessing the risks and benefits of lighting the Williamsburg fields. Their thoughtful evaluation formed the foundation of my recommendation.

This was not an easy call, but the county’s policy is that we light synthetic turf fields, and I am convinced, by our experience in lighting other fields in residential neighborhoods, that we can mitigate whatever adverse impacts lights might have. Our entire community will benefit from providing more playing time for our growing number of young people who are playing field sports.

The recommendation has brought a strong reaction from local residents, who delivered a petition with more than 550 signatures against lights on the fields to the County Board.

The Board previously appointed the Williamsburg Field Site Evaluation Work Group to study the effects of lights and propose options, but Gail Harrison, a member of the group, said it was not presented with the plan Schwartz has advanced until a few days before its last meeting.

Harrison said the “11th-hour proposal” by lighting company Musco was a “fundamental breach of the public process.” Harrison said adding lights is not appropriate for the Rock Spring neighborhood.

“The [Rock Spring] Civic Association surrounding the fields has taken a strong and consistent position over many years that field lights at this location are incompatible with the character of the neighborhood,” Harrison told ARLnow on Friday afternoon. “The neighborhood civic association has stressed going back to at least 2009 or before that, its intention to try to preserve the neighborhood in its natural condition, to minimize traffic, to protect wildlife habitat and the tree canopy. The proposal would be inconsistent with all of those neighborhood goals.”

Schwartz said he made his recommendation based on the need for more playing time on Arlington’s fields. He will bring his recommendations to the County Board’s September meeting for further discussion.

More from a county press release after the jump:

(more…)


Arlington Public Schools will add 1,300 high school seats across the Education Center and the Career Center after the School Board approved the so-called “hybrid option” at its meeting Thursday.

The option, put forward by Superintendent Patrick Murphy last month, would add 500-600 seats to a renovated Education Center (1426 N. Quincy Street) by 2022, then add another 700-800 at the Career Center (816 S. Walter Reed Drive), which would get a renovation and an addition. The County Board denied a request to designate the Education Center as a historic district last month.

Murphy’s proposal had not been among the original short list of three finalists for the new high school site, but Board members said it would balance the need for more seats with limited building space, and make use of what already exists.

“We cannot allow this Ed Center site to lie fallow,” said Board member Reid Goldstein. “We go to the County Board every year and we tell them we need more: we need more money; we need more land. I’m a taxpayer too. We cannot have a site that could hold students going unused.”

By December, Murphy must also provide a list of recommendations for the Education Center, including its cost, any boundary changes needed and educational programming. He must make similar recommendations for the Career Center no later than May 2018.

In addition to their vote in favor of the plan, Board members directed Murphy to include options for a fourth comprehensive high school, including programming, cost and location, in APS’ 2019-2028 capital budget. Arlington currently has three comprehensive high schools: Washington-Lee, Wakefield and Yorktown.

“It’s not a blank slate,” said Board chair Nancy Van Doren. “We have eight points we want answers to, we have a finite amount of money and we have a vision that says we’re going to need to potentially add onto those and make them into something even greater going forward. So we want to leave our options open, and one thing I think we’ve learned to do is not create buildings that aren’t flexible.”

The Board voted 4-1 in favor of the plan, with James Lander the lone dissenting vote. He said the plan was not the best use of the space at the Career Center, had safety concerns around traffic on S. Walter Reed Drive and worries about locating high school students close to Patrick Henry Elementary School.

“If you know someone with 40 acres in Arlington who is willing to sell to the school system, I would be happy to negotiate that,” Lander said. “Until then, we have to utilize the space effectively that we have now, and we have to think about what our needs could be potentially down the road. I think this site could be better used than just 600 seats.”

The perceived lack of consultation with nearby residents on the new option came in for some criticism during public testimony. Maria “Pete” Durgan, president of the Penrose Neighborhood Association, urged the Board to delay their vote to explore the hybrid model further.

“We feel disappointed in the way the solution came about because we don’t feel like we were presented with the various scenarios and had an opportunity on what would affect us greatly,” she said.

Goldstein raised similar concerns with the way the fourth option came forward, and challenged his colleagues to think about how they continue engaging with the community even as new ideas come forward late in the game.

“How do we do idea changes or option changes in a project like this when there isn’t enough time to extend the community engagement process?” he asked.

Board vice chair Barbara Kanninen said APS intends to get “right back out there” in the fall to begin discussing the new schools, and may look at convening something similar to the South Arlington Working Group that helped site a new elementary school.

“After tonight, we’re proceeding with two projects, and I’m excited about both of them, the Ed Center project, the Career Center site, but it’s no longer a hybrid,” Kanninen said. “These are two projects, just like we have several other projects on the books.”


View More Stories