Bike and Walk to School Day — Today was Bike and Walk to School Day for Arlington Public Schools. The yearly event encourages families to use their feet — rather than cars — to get to school, at least for a day. [Twitter, Twitter, Twitter]

Hospital Expansion Meets Some Resistance — Some neighbors are at odds with Virginia Hospital Center over its plan to expand its campus. Complaints include objections to “height and mass in close proximity to single-family homes” and the large number of proposed parking spaces. [Greater Greater Washington]

Machinery Topples Over, Blocking Road — A piece of heavy machinery toppled over on Little Falls Road at N. Sycamore Street in the Williamsburg neighborhood yesterday. The cleanup temporarily blocked Little Falls Road. [Twitter]

Fourth High School Could Cost >$250 Million — “Redeveloping portions of the Arlington Career Center campus near Columbia Pike to accommodate a fourth general high school in Arlington could end up costing a quarter-billion dollars or more depending on amenities, according to preliminary cost estimates being fleshed out by school officials.” [InsideNova]

Another Farmers Market Opens — Arlington County is now home to ten farmers markets, with another on the way. The Arlington Mill farmers market opened over the weekend and hosted a Latin jazz band and Arlington’s Art Truck, in addition to numerous food vendors. [Arlington County]

More on Controversial Favola Auction Item — “Brian White of Winchester was the winning Democratic bidder. He said in an interview Monday that he thought the offer blurred the line of appropriateness, but had an idea: ‘I was looking at how much it was and I was like, Dominion [Energy] pays a whole lot more for this type of access.’ He said he plans to offer the day in Richmond to Theresa ‘Red’ Terry, the Roanoke County woman who spent 34 days living in a tree stand to protest incursion of a natural gas pipeline through her land.” [Richmond Times-Dispatch]

Flickr pool photo by Erinn Shirley


An Arlington elementary school is earning some kudos for its energy efficiency, after it generated more energy than it used last year.

The nonprofit International Living Future Institute awarded Discovery Elementary School with its “zero energy” certification on May 2, meaning that the school was powered completely by on-site renewable energy sources over the course of a whole year.

Discovery, which opened in September 2015, is just the fourth school across the country to earn this certification, and the largest building of any type with such a distinction, according to a press release.

The building’s designer, Charlottesville-based VMDO Architects, says Discovery’s energy systems saved Arlington Public Schools roughly $117,000 in annual utility costs. The firm also estimates that the building sent roughly 100,000 kilowatt hours of excess energy back to the electrical grid, enough to meet the average power needs of 7.5 households.

APS partnered with the U.S. Department of Energy to help design plans for “zero energy” school facilities, and last year changed its procurement rules to require that contractors can meet that energy standard. The school also designs lessons about renewable energy around the building’s systems, giving students hands-on experience with the facility.

“What is most important about [Discovery] is that it allows teachers to think about how students learn,” Discovery principal Erin Russo wrote in a statement. “Curriculum is just something the state gives to us and you can teach that anywhere, but with this space, we can get creative, experiment and shepherd meaningful experiences.”

Photo via @DiscoveryAPS


Internet connections are down across all Arlington Public Schools.

Both the internet and email systems are experiencing an extended outage, APS announced Monday afternoon. The outage is not expected to be resolved before the end of the school day, APS said.

APS spokesman Frank Bellavia told ARLnow that the school system’s internet vendor is experiencing problems, and they believe that “some cables were cut somewhere.” He added that there’s no timetable for the problem to be fixed.

Anyone who needs to reach school staff is being to encouraged to call rather than email.


The Arlington School Board managed to avoid class size increases in its new budget, but the county’s worsening financial outlook has school leaders warning that future spending plans could include additional painful cuts.

The School Board voted unanimously Thursday to approve a roughly $637 million budget for fiscal year 2019, though board members expressed plenty of trepidation about the document.

“This was a very difficult year, and I think we’re going to have a few more difficult years,” said board member Tannia Talento. “The things we were able to save this year, we may not be able to save next year. We just need to be aware of that reality.”

Just as the County Board has been wrestling with challenges associated with a shrinking commercial tax base and ballooning Metro expenses, Arlington Public Schools officials have been forced to start doing some belt tightening as well. Superintendent Patrick Murphy proposed about $10 million in spending cuts in the budget he sent to the board, targeting areas like employee benefits and planned hires, and he warned that the rapid pace of student enrollment is likely to only make budget pressures more acute in the coming years.

However, the School Board was able to push off the impact of this year’s budget squeeze in some select areas, thanks to an extra $3.2 million in one-time funding the County Board opted to send to the school system as it finalized its budget on April 22.

The School Board decided Thursday to use the bulk of that money — roughly $2.6 million — to delay a bump in class sizes across every grade level for one year, saving 28 jobs from the chopping block in the process. Murphy had originally proposed upping average elementary school class sizes by one student each, with average increases of .75 pupils in each middle school class and .5 students in high school classes.

But using that money to avoid class size increases was not without controversy; it passed on a 3-2 vote, with Vice Chair Reid Goldstein and board member Monique O’Grady dissenting. While neither board member expressed any great satisfaction with those votes, both stressed that they’d rather see the school system save up now to prepare for choppy financial waters ahead.

“I don’t like taking cuts, but the reality is we must do so,” Goldstein said. “Tightening the belt means things are not going to be perfect all the way around.”

Yet board members like Chair Barbara Kanninen argued that keeping class sizes small is “a hallmark of our school system,” justifying the extra spending. Furthermore, she reasoned that the board could use the county’s one-time funding to support such a change because APS wouldn’t be adding any new positions with the money, merely supporting existing employees.

(more…)


L.A. Bar and Grill Reopening — After closing for renovations (and because it was late in renewing its state alcohol license) Columbia Pike watering hole L.A. Bar and Grill is planning to reopen this weekend, just in time for Cinco de Mayo. [Facebook, Facebook]

The D.C. Case for the Rosslyn Gondola — “The Gondola will provide anyone within the Metro catchment area a faster trip to Georgetown. With the Gondola, the total travel time to Georgetown drops to less than 30 minutes for a much larger part of the region, including areas of the District with the greatest need for employment opportunities, giving them a faster way to connect with jobs in Georgetown.” [D.C. Policy Center]

Petition Against iPads in Middle School Cafeterias — An online petition, signed by nearly 100 people, seeks to have Arlington Public Schools strengthen its rules regarding iPad use in middle schools. Specifically, the signers want iPads to be used in classrooms and not during lunchtime or recess. Such a policy, the petition creators wrote, would “ensure that APS electronic resources enhance, and do not detract from, the learning process of middle school students.” [Change.org]

More ART Arrival Info IssuesOnce again, Arlington Transit is having problems with its real-time bus arrival system. Officials told ARLnow.com that a technical issue with the contractor that provides the system was to blame. [Twitter]

Native Plant Sale This Weekend — The Long Branch Nature Center will host a sale of “plants that are accustomed to local climate and wildlife” on Saturday afternoon. [Arlington County]

Scott McGeary Lauded — “Decades ago, Scott McGeary’s parents would take him to occasional celebratory dinners at the Key Bridge Marriott, where they would enjoy both the food and the vistas of the nation’s capital… On May 2, McGeary was again at the hotel, this time in the 14th-floor ballroom as he was inducted into the Arlington Business Hall of Fame.” [InsideNova]

Four Mile Run Dye Testing — Arlington County is conducting dye testing along S. Four Mile Run Drive today. Traces of green and red dye may be seen in Four Mile Run as a result. [Twitter]

Flickr pool photo by Erinn Shirley


(Updated at noon) The price tag for a new elementary school could soon get a bit larger, in an effort to make the Thomas Jefferson Middle School more accessible for people with disabilities.

Arlington Public Schools officials are asking the School Board to approve an extra $250,000 in spending at Alice West Fleet Elementary School, which is scheduled to open in September 2019, for Americans with Disabilities Act (ADA) changes at the adjacent middle school.

The board will get its first presentation on that request at its meeting tonight, as staff seek the green light to bump up the “guaranteed maximum price” for the nearly $47 million project. The changes at the middle school are being incorporated into the Fleet project so that they can be “more effectively coordinated and can be completed prior to the 2018-19 School Year.”

APS officials plan to make accessibility adjustments at two of the middle school’s three entrances.

Though accessibility upgrades are already in the larger APS budget, the size of the change to the Fleet budget means APS will need the board’s approval first. Voting on the matter is expected within a few weeks.

The board is set to approve its fiscal year 2019 budget tonight. The nearly $637 million spending plan is set to fund pay raises for most school employees, but does call for slightly larger class sizes at both the elementary and middle school levels.

Editor’s note: a previous version of this article mistakenly reported that the changes were planned for the elementary school. Photo courtesy Arlington Public Schools.


(Updated at 2:50 p.m.) Arlington Public Schools staff have named seven elementary schools that could host countywide “option” programs in the coming years, as officials move ahead with their reevaluation of elementary school boundaries scheduled to wrap up this fall.

Yesterday (May 1), APS released an updated draft analysis of potential changes to county elementary schools, with the bulk of the document addressing which schools could someday offer option programs — meaning they are open to student applicants from all over the county. APS currently is eyeing seven possible locations, but aims to keep a total of five schools as option program sites.

Staff indicate that Campbell, Carlin Springs and Patrick Henry Elementary Schools are all likely to earn their recommendation to either become or remain option sites. Barcroft, Claremont and Nottingham Elementary Schools and the Arlington Traditional School are also cited as possibilities to fill the final two available slots, though APS doesn’t plan to offer final recommendations to the board until sometime this fall.

APS currently has five option schools at the elementary level: Arlington Traditional School and Campbell, Claremont, Drew and Key Elementary Schools. The rest are all “neighborhood schools,” meaning only students who live within set boundaries are eligible to attend.

With two new elementary schools set to open over the next three years, the School Board asked APS staff to work up two proposals for policymakers to consider. One would leave all the option and neighborhood school designations the same and adjust attendance boundaries; the other would change both the school designations and the boundaries.

Staff will offer the board a definitive set of recommendations about how the mix of option and neighborhood schools might change. The May 1 analysis explores a host of factors to guide those choices, such as how changing those designations would affect transportation options and the proximity of Spanish-language programs to Spanish-speaking students.

The School Board has already agreed to move the county’s “Montessori” program from Drew Model School to Patrick Henry Elementary School for the 2019-2020 school year, with Drew changing to a neighborhood school, so at least one option site is guaranteed to change. In the May 1 analysis, APS staff suggest that the board could keep the “Expeditionary Learning” program at Campbell Elementary School and establish a new Spanish immersion program at Carlin Springs.

That leaves two spots for option programs empty, and the analysis suggests that the school system could maintain Claremont or Arlington Traditional School as option sites, or convert Barcroft or Nottingham Elementary Schools.

Staff floated the possibility of running option programs at three schools in close proximity — Barcroft, Carlin Springs and Claremont — in order to achieve “greater transportation efficiency” when busing in students from around the county.

(more…)


Arvaye Robinson, the mother of two elementary school girls she had hoped to enroll in the Arlington Public Schools extended day program, stood in front of the Syphax Education Center this morning during the system’s technical problems that ultimately suspended sign-up indefinitely.

“I’m so disappointed,” Robinson said, exasperated, with her phone in her hand waiting to hear from a school staffer. “I wanted some confirmation.”

After setting an alarm for exactly 7:59 a.m. so she could hop online and enroll her children, Robinson realized that the site was down and that she would have to drive to the center to enroll her children in person. She was told that she would receive a call about placement, but she didn’t feel confident about that.

“They have the means to take payment, but no concrete confirmation,” said Robinson.

A father who overheard ARLnow interviewing Robinson cut into the conversation, calling the situation absurd and saying that it had thrown his work schedule out the window for the second year in a row.

Indeed, this is the second consecutive year that extended day registration has flopped. There are varying reports of exactly how many parents waited in line to secure a spot for their children, but one parent told ARLnow she saw at least 100 people in the Syphax Education Center’s lobby this morning.

The extended day program allows parents “who can’t juggle everything” to leave children in their school’s care before and after classes, according to the program’ director, Bobby Kaplow.

According to Kaplow, after last year’s technical failure with the same vendor, APS spent the year troubleshooting with the contractor, trying to find a solution.

“All year we worked with him, we told him what we needed, we told him what the problem was, can he see it on his end,” Kaplow said, adding that he had demanded that the contractor fly in from Michigan to be on-site for the enrollment rollout today in case any issues cropped up.

“I talked to him 20 minutes before it started today, and said, ‘Are we good?'” Kaplow said. The contractor told the director that there wouldn’t be any problems.

(more…)


Arlington Public Schools has once again run into issues with online registration for its “Extended Day” program, prompting big headaches for parents and an indefinite delay in program sign-ups.

APS announced on its Facebook page at 9:30 a.m. that it will be suspending registrations for the program until it can resolve “technical issues” with its registration system. “Extended Day” is designed to offer low-cost care for students before and after school.

APS added that the software vendor is currently working to fix these problems, and will announce a new registration start time soon.

Registration for “Extended Day” opened at 8 a.m., and with spots available at each school on a first-come, first-served basis, parents rushed to sign up for the program. Yet the system began experiencing problems soon afterward, and APS tweeted that it had summoned its contractor to address those issues, but didn’t immediately suspend registration.

The confusion prompted some parents to attempt to register in person, with dozens waiting in line at the school division’s headquarters at the Syphax Education Center to attempt to sign up.

The episode mirrors APS’ problems last year, when the system crashed during its first try at accepting online registrations in March, then again in April.

Photo courtesy of Drew H.


Arlington Public Schools Superintendent Patrick Murphy has named a temporary replacement for Patrick Henry Elementary School Principal Annie Turner, following her sudden death last month.

Cameron Snyder, the school’s assistant principal for the last four years, will fill in as acting principal through the end of the school year, APS announced Friday (April 27).

Murphy cited Snyder’s “excellent leadership and support to the Henry community” in the wake of Turner’s death as a factor in his decision.

“Cameron’s knowledge of Henry’s instructional program, operations, staff, students and community make her uniquely qualified to successfully lead the school to the end of the year,” Murphy wrote in a statement.

Snyder previously spent five years at Henry as a teacher, and became the school’s lead math teacher.

Murphy also announced that Elizabeth Walsh, an APS staffer since 2012, will temporarily fill in as assistant principal now that Snyder’s taken the top job at Henry.

Turner had served as the school’s principal since 2014, prior to her sudden passing on March 31. School officials told parents at the time that they did not know how she died.

Photo courtesy of Arlington Public Schools


A child care center for Arlington Public Schools employees now has the green light to temporarily move to a Ballston office building.

The Arlington County Board voted unanimously on April 24 to approve an updated permit for The Children’s School, clearing the way for the nonprofit to relocate to the second and third floors of a building located at 4420 N. Fairfax Drive.

The co-op program has long operated out of the Reed School building in Westover, but, with APS officials planning to open a new elementary school at that site in 2021, The Children’s School has been forced to go elsewhere.

The program’s leaders are currently eyeing the former Alpine Restaurant property along Lee Highway as a permanent home for the daycare center, but they plan to start accepting students at the Ballston location this July while they work out the details.

The newly renewed permit for the program allows it to accept up to 200 children at the facility, and also allows the nonprofit to build a new playground behind the building.

Yet some residents of the condos at the Continental at Ballston, which sits directly behind the program’s new home, raised concerns with the County Board about how the childcare center could impact traffic and parking in the area.

The permit allows for parents picking up and dropping off students to circle around the building using small side street, then turn onto N. Vermont Street to return to N. Fairfax Drive. That prompted concerns that a steady stream of cars passing through in the morning and afternoon could cause headaches for Continental residents, but board members assured the public that they don’t expect any traffic problems with the program’s proposal.

“This is supposed to be a temporary solution,” said Vice Chair Christian Dorsey at the board meeting. “Conceptually, on paper, we think this is going to work just fine. And we have the fall back to know, if this doesn’t work, we can fix it.”

The board is set to review the center’s permit in April 2019, giving Arlington officials a chance to see if the new arrangement is working out for all involved.

Photo via Google Maps


View More Stories