Update at 9:40 a.m. on 2/22/21 — At the public Feb 20 County Board meeting, the board officially codified the motion to provide relief for Arlington taxi companies. It was part of the consent agenda, meaning it’s non-controversial and passed with a single vote.

Original – The County Board is providing relief to struggling Arlington taxi companies.

At Tuesday’s meeting, the Board passed a motion to waive 2021 certificate fees for up to 50 cabs per company, as well as for all wheelchair accessible taxicab vehicles. For those companies that have more than 50 cabs, a reduced annual fee of $50 per cab, down from $150, will apply.

Arlington’s taxicab ordinance requires an annual renewal certificate of public convenience and necessity for each cab on the road. That fee typically is $150 to be paid by February 1.

The County Board’s motion is different from the one County Manager Mark Schwartz initially proposed in the staff report. That proposal called for all certificate fees to be cut from $150 to $50 and be waived only wheelchair accessible vehicles.

The Board felt that this motion did not go far enough in helping an industry that’s been devastated in recent years not just by the pandemic, but also by the rise of ride hailing companies like Uber and Lyft.

In Arlington, six cab companies are currently in operation: Hess, Arlington Yellow, Crown, Friendly, Blue Top, and Red Top — the latter of which is the largest.

Combined, the companies had 477 cabs operating on local roads in 2020. That’s down from 542 in 2019 and a record-high of 847 in 2017.

Many of these companies have been in operation for decades, still owned and operated by the same families.

“It is devastating to see what’s happening to the taxi industry,” County Board Member Christian Dorsey said at the meeting. “It’s like switchboard operators of the past. It’s an industry that’s being driven into obsolescence. And COVID has hastened that decline.”

The call for help came from the companies themselves, in the form of letters and public comments at the meeting, in which speakers asked for a reduction or waiving of the fees.

John Massoud was one of those who sent a letter. He’s vice-president of Blue Top Cabs, a company he and his father founded in 1984. Massoud tells ARLnow that while Blue Top took a hit when Uber and Lyft became popular, they were doing okay.

“We were adapting. It was difficult, but we were getting it done,” says Massoud. “But then the virus hit.”

The company lost nearly a million dollars in revenue since the pandemic, he says, mostly due to the closing of Arlington Public Schools — transporting students is a huge part of their business.

We are one of the only two companies in Arlington to have wheelchair vans,” says Massoud. “Our business model has always been focused on serving Arlington residents and the special needs community.”

He requested a two year waiver of the fee and believes the steps taken by the Board are “in the right direction,” but it still leaves him in tough spot.

“We have 119 certificates and most drivers aren’t working, so we are paying for something we can’t use,” Massoud said.

Ninety-year-old Hartman Reed of Crown Cabs is the owner of one of the two Black-owned cab businesses in Arlington, which historically provided rides to those in the Green Valley and Halls Hill communities when other cabs would not.

He explained at the meeting that in the nearly five decades he’s been in business, 2020 was the hardest.

“I’ve been in this business for 47 years — 46 of those years have been wonderful, but this year has been devastating,” he said.

Since April, the company has only made $800 in revenue and a number of drivers have given up their certificates.

Darryl Collins, owner of Friendly Cabs, also spoke, noting that his grandfather started the company in 1948 because of segregation.

“African-Americans couldn’t be born in Arlington, Virginia, so we had to transport [pregnant mothers] to Howard University Hospital [in D.C.],” he said.

He, too, said they’re struggling immensely, losing thousands of dollars every month.

The County Manager’s proposal would have cost the county about $50,000 in revenue in comparison to 2020. That loss of revenue will be higher given the motion that the County Board did pass, though the exact figures have yet to be reported.

Four out of the six cab companies in Arlington have fewer than 50 vehicles, meaning that they will not pay any certification fees for the upcoming year.

Red Top and Blue Top both operate more than 150 cabs, meaning they’ll pay the $50 fee on a large portion of their fleet. However, those companies are the only ones that operate wheelchair accessible vehicles and will not have to pay any fees on those.

All of this helps, says Massoud, but he says he’s lost 90% to 95% of his business. This has left him fearful that the family taxi business may not last.

“I’m not an optimist or a pessimist. I’m a realist,” he says. “I don’t know what’s going to happen.”


As early as mid-spring, light poles along Wilson Blvd in Clarendon will be outfitted with new fixtures that monitor crowds and identify potential emergencies.

The technology will be installed sometime this spring as part of a pilot project involving multiple Arlington County departments as well as Comcast, the Commonwealth Cyber Initiative and US Ignite — a nonprofit focused on community innovation. The initiative is dubbed the “Safety and Innovation Zone demonstration project.”

During its recessed meeting yesterday (Tuesday), the County Board voted 4-1, with Takis Karantonis dissenting, in favor of the pilot project. US Ignite is donating $90,000 to buy the light fixtures, which Comcast will provide, along with a three-month trial of public Wi-Fi in the area.

Karantonis said his vote should not be interpreted as a vote of no-confidence, but rather, it should signal that he is still skeptical and would like to see more public engagement.

The primary use for the fixtures, to be installed along the 2900 block of Wilson Blvd, will be “people counting,” said Holly Hartell, who presented the project on behalf of the Department of Technology Services. In other words, the light fixtures will monitor crowd sizes and flow to recognize unexpected movements that could indicate a potential threat or emergency situation.

“This is an effort to speed things up where seconds and minutes count,” said Arlington County Fire Chief David Povlitz. “If we could gain information to send the right resource to the right place in a timely fashion that could really accelerate us operationally and also safety-wise.”

The light fixtures do not have the capacity to videotape people, capture images or provide identifying information, Hartell said. They can pick up the presence or absence of an event they have been programmed to detect, such as a large crowd moving quickly. This data will be converted into text and sent to a dashboard in the county’s Emergency Communications Center.

“Everything will be anonymous,” Hartell said. “You will never be able to identify an individual person.”

Later on, the technology could be used to detect falls, blasts, shots, and distress cries, as well as sudden temperature changes or the presence of smoke.

The fire chief added that “this [pilot] is just a start and we hope to be able to build this out in the county in time.”

“We are aware of people who are concerned,” Hartell later told ARLnow, of questions raised about the project. “I understand their concerns, and I want to give them the confidence that what we’re looking at is not going to be in any way impacting their privacy.”

The partners in the project — CCI, US Ignite and Comcast — are all providing best practices on collecting data while respecting privacy, she said. The county has also developed a privacy framework to use as it goes about the project.

“We are protecting people’s privacy while improving our services,” she said.

The pilot project will be in place for about one year. The first few months will be spent refining the uses for the technology, followed by six months of data collection, and finally, an assessment period. Next spring, the county will decide if the project could be replicated elsewhere. At that time, there will be robust public engagement opportunities, Hartell said.

During the meeting, Hartell said the block was chosen because it has a vibrant business district and a “pretty active restaurant and pedestrian activity,” even now during the pandemic.

One incident the technology might have caught in that location, had it been in place a few years ago: the famous 2018 Cheesecake Factory incident, when a promotion for free cheesecake got out of control

The original proposal was to focus on social distancing and mask-wearing, according to the staff report. A small number of business members of the Clarendon Alliance were consulted on the idea, and their concern led to a shift away from coronavirus measures, staff said.

Photo 1 via Google Maps, photos 2-3 via Arlington County


Arlington County will be soon implementing an additional $200 fine for speeding on eight mostly residential streets.

The additional fine was approved by the County Board last January, but it has taken a year to fully implement due to the need for collecting speed data, as well as pandemic-related installation delays.

It’s part of the county’s Vision Zero program, first adopted in July 2019, designed to take a holistic approach in eliminating traffic fatalities and serious injuries.

Signage is expected to go up over the next couple of months for the first four street segments, discussed at last night’s County Board meeting:

  • 28th Street S. from S. Meade Street to Army Navy Drive
  • N. Ohio Street from 14th Street N. to Wilson Blvd
  • 23rd Street S. from Army Navy Drive to Fern Street
  • John Marshall Drive from Little Falls Road to Lee Hwy

Then, come the spring, four more streets will receive signage and enforcement, according to the county Transportation Engineering and Operations Bureau Chief Hui Wang. They include:

  • N. Harrison Street from Lee Hwy to 37th Street N.
  • Patrick Henry Drive from N. George Mason Drive to Wilson Blvd
  • S. George Mason Drive from S. Dinwiddie Street to S. Four Mile Run Drive
  • 7th Road S. from Columbia Pike to S. Carlin Springs Road

All of these streets have a 25 mph speed limit, except for S. George Mason Drive from S. Dinwiddie Street to S. Four Mile Run Drive (which is 30 mph).

The eight new streets are in addition to those that were instituted early last year:

  • S. Carlin Springs Road from Columbia Pike to S. George Mason Drive
  • Military Road from Old Glebe Road to Nelly Custis Drive
  • Lorcom Lane from Military Road to Spout Run Parkway

The installation of these signs began in February 2020 and was completed in April, in the midst of the pandemic.

The $200 fine is in addition to the standard $6 for every mile per hour above the speed limit and the $66 in court fees. So, for example, if a motorist is given a ticket for being 10 mph over the speed limit in one of these corridors, the fine would be $326.

Wang explained the corridors were chosen based on five years worth of data that showed a “documented speeding issue.” Those are mostly near residential, school, park, and other pedestrian-heavy areas.

She also said that this a relatively cheap method to deal with speeding.

“This is a low cost measure to address speeding,” Wang said. “It’s just additional signage.”

There’s also potential for other coordiors to be chosen for this increased fine, but further data collection and analysis is ongoing.

Spurred by a question from County Board member Libby Garvey, Wang said that placards or warning flags are being considered for the new speed signs to ensure they are catching the attention of motorists. Those will be taken down after residents get used to the new fines and signs.

“Yeah, which may take a few fines,” said Garvey.

File photo


(Updated at 1:30 p.m.) Arlington County has asked JBG Smith to go back to the drawing board after reviewing its plans to upgrade the Crystal City Water Park.

The privately-owned park at 1601 Crystal Drive currently includes water features, trees, and a food stand. It has frequently been used for local events and gatherings.

The project to upgrade it will be deferred two months so that JBG Smith can address pedestrian and cyclist safety concerns raised by Arlington County Board members and community members during the Board’s Tuesday night meeting.

“This is not a fully baked plan yet,” Board member Christian Dorsey said. 

The Bethesda-based real estate company is proposing a new performance area, more outdoor seating, preserving and updating the existing water fountain, and incorporating a new water feature in the center of the site. The proposal also includes a number of retail structures: small kiosks, a bar, and a trailhead restroom facility.

Most of the discussion was devoted to two paths — one ADA-accessible — that JBG Smith proposed to build to connect people to the nearby VRE station and the Mount Vernon Trail. A small pathway linked the two connections.

Community members and County Board members said these paths, as proposed, would create conflicts between pedestrians and bicyclists. People would have to cross the Mount Vernon Trail connector to get to the rest of the park and cyclists would be battling a grade change while avoiding pedestrians.

“We thought we were being helpful, but we’re hearing loudly and clearly that this is scaring people, and we should reconsider it,” said Robin Mosle, a consultant on the project.

The Bethesda-based real estate company opted out of a public design process — something that drew the frustration of some Board members, including Takis Karantonis.

“This would be a conversation that we would have had in the Park and Recreation Commission in advance of the meeting,” Karantonis said. 

The County Board is now expected to see the project again when it meets in March.  

News of a plan to invigorate the park with new retail dates back at least to 2017, when ARLnow reported that the concession stand in the park had closed. A few months later, The Stand opened in its place, hosting many pop-up eateries. In April, D.C. food truck Peruvian Brothers took it over.

Photos via Arlington County


A 94-year-old water main that runs under the residential area north of Clarendon to Courthouse is finally set to be replaced.

On Saturday, the County Board approved a contract for the construction of a new water main along Key Blvd, running from N. Jackson Street to N. Danville Street in Lyon Village. It passed as a consent item, meaning it was deemed non-controversial and was acted upon by a single vote.

The new water main will replace the existing one, which was built in 1927. The new main will improve fire flow capacity and meet neighborhood demand, county staff wrote.

The staff report notes that the aging water main has “had an excessive number of breaks in the past few years.” This includes most recently in July, Arlington’s Department of Environmental Services (DES) confirms.

This project is one of a number of recent efforts to replace old, unlined cast iron pipes, which can more easily break and become corroded.

The contract for the Key Blvd water main was awarded to the lowest bidder, Crown Construction Services, which provided an estimate under the county engineer’s estimated cost. As approved, the authorized contract total is $1.4 million, including contract contingencies.

The county has previously worked with Crown Construction on the Glencarlyn Park renovations.

Construction is expected to start this spring, a DES spokesperson tells ARLnow, with completion set for fall 2022. Water disruption notices will be sent to all affected residents.

Planned water service disruptions will “typically less than a day,” according to the county staff report, and will be limited to 9 a.m. to 4 p.m. Monday through Friday.

Map via Arlington County


(Updated at 3:15 p.m.) Arlington officials are again looking to amend the county’s much-talked-about towing ordinance.

A number of the proposed changes would bring the county’s ordinance in line with Virginia law, which was recently updated. However, several may be met with public pushback, including increases in some towing fees.

Today (Tuesday), as part of its recessed meeting, the County Board will vote to advertise a public hearing in February on the changes, as proposed by the County Manager and Trespass Towing Advisory Board (TTAB).

The proposals include updating the definition of “immobilization,” reinforcing the ban on certain public safety vehicles from being towed, and more re-defining who is allowed to tow and when.

The definition of “immobilization” would mean anything “that does not damage the vehicle,” including booting and using barnacles, for which the towing operator can charge a $25 fee to remove. To bring county code in line with Virginia’s, it clarifies language specifying that police, fire, and public safety vehicles parked temporarily can not be towed.

TTAB also agrees that vehicle owners should be able to request information via email from towing operators, like photos and authorization contracts. An email address would must be provided by the towing operator.

Basic towing fee increases are being proposed, from $135 to $150, as well as an increase of the additional fees for night and/or weekend towing, from $25 to $30. That brings the maximum possible towing fee to $210, for a vehicle towed on a weekend night.

This accounts, according to the TTAB, for “rising labor costs and shortage of qualified commercial driver candidates.”

An additional fee change would lower the cost to pay a tow driver to release a vehicle, if the owner arrives before it’s towed.

“The County Manager recommends reducing the in lieu of towing, or ‘drop fee’ from $25 to $10,” a presentation on the changes notes.

Another change would be who is allowed to tow and when.

In April 2017, Virginia Governor Terry McAuliffe signed a bill that contradicted a county law forcing local businesses to authorize each individual tow from their property (or “real-time authorization”).

Only months earlier, the Arlington County Board had voted to approve this real-time authorization as a means “to mitigate aggressive towing practices” — a recurring issue in Arlington. The County Board chair at the time, Jay Fisette, expressed disappointment at the governor’s decision. (McAuliffe is currently mounting another gubernatorial campaign.)

Now, the County Manager and TTAB are proposing to bring county code in line with the Commonwealth and to officially negate the 2016 county law. Using “language derived” from Virginia, the county is proposing that a written contract is enough authorization for towing operators to monitor and tow from private lots without real-time authorization.

Other changes are being proposed to the ordinance with the stated goal of consumer protection. Those include ensuring towing facilities are properly lit, towing placards are properly displayed, and requiring that towing signs “clearly state hours of the day, and days of the week, that towing is in effect.”


The County Board approved safety improvements for pedestrians and cyclists on Columbia Pike over Four Mile Run, as well as other changes, during its regular meeting on Saturday.

The approved $1 million Four Mile Run bridge project includes widening the northern sidewalk next to westbound traffic from five feet to 10 feet and narrowing the traffic lanes. Lighting will also be added to the northern side of the bridge.

Sturdy guardrails will be installed at the approaches to the bridge, but not on the bridge, county transportation spokesman Eric Balliet previously told ARLnow. The expanded sidewalk will remain 9 inches above street level, to help protect pedestrians.

County Board Chair Matt de Ferranti said during the meeting that he was pleased to approve the project, which makes the bridge more accessible.

“It is part of a big investment that we’ve been working on for multiple years, the Columbia Pike Multimodal Street Improvements project,” he said.

Board member Takis Karantonis said the changes are significant and a long time in coming.

“This has always been a big problem for pedestrians,” he said. “It’s really scary sometimes, with traffic going both ways, very fast.”

Community feedback has also been positive, notes a county staff report.

“The widening is a welcome change that many in the community have asked for during the outreach and engagement on the Columbia Pike Multimodal Project,” the report said. “The addition of lighting has also been received positively, as the community members shared that this section of the Pike often feels dark and unsafe.”

Some community members requested a barrier between the sidewalk and road. The suggestion was ultimately not included, as the bridge cannot fit one along with a widened sidewalk and four travel lanes, according to the report.

Implementation was anticipated to begin last fall, but the timeline changed because the County decided to combine the updates to the sidewalk with other scheduled maintenance on the bridge, hiring one contractor to do both, Balliet said in an email.

Separately, the Board also gave its stamp of approval to the proposed realignment of the eastern end of Columbia Pike, part of a project that adds 70 acres to Arlington National Cemetery near the Air Force Memorial.

The federal government is paying for the $60 million road project, after acquiring county-owned land for the expansion via an eminent domain suit last summer.

The project realigns segments of Columbia Pike, S. Joyce Street and Washington Blvd, constructs a new S. Nash Street, partially eliminates Southgate Road and designs a new portion of trail, according to a staff report.

Images via Arlington County


Rosslyn Redevelopment Approved — “The Arlington County Board today approved a mixed-use redevelopment that will add 740 new housing units, including on-site affordable housing, to the Rosslyn neighborhood. The Board approved developer Snell Properties’ plan to build two residential towers with ground-floor retail and office/retail flex space at 1820 and 1830 Fort Myer Drive in Rosslyn.” [Arlington County]

Inova Cancels Vaccine Appointments, Too — “COVID-19 vaccine supply shortages have forced Inova Health System to cancel first-dose appointments for people in Northern Virginia’s Group 1B starting Tuesday, a group that includes employees of Fairfax County Public Schools. The news comes as elected leaders appeal directly to the governor for more doses.” [NBC 4]

Virginia Ranks Last in U.S. for Vaccinations — New data ranks Virginia dead last in terms of percentage of COVID-19 vaccines administered. That has prompted bipartisan criticism and questions for Virginia Gov. Ralph Northam. [Becker’s Hospital Review, Twitter, Twitter]

UK Coronavirus Variant Found in N. Va. — “A variant of the COVID-19 virus first found in the United Kingdom last year has been found in Virginia, in the state’s first case, officials say. A Northern Virginia resident with no reported recent travel history tested positive for the variant, the Virginia Department of Health announced in a statement Monday afternoon.” [NBC 4]

Cases Still Growing in Virginia — “A new report paints a grim picture of Virginia’s coronavirus response. New York Times data shows new cases in the Commonwealth have risen 12 percent in the past 14 days ending Saturday, making Virginia the ‘only state reporting significant increases in new cases.'” [Fox 5]

Coming Soon: Lots of Cicadas — “Gazillions of insects that have been underground since Britney married K-Fed will tunnel through the earth this spring. When they emerge, they’ll ruin young trees, delight food-motivated dogs, and just generally gross out a high percentage of the population. Yes, the cicadas of Brood X… are due back in the DC area (and most of the East Coast) this spring, possibly around late April or mid-May.” [Washingtonian]


A number of major changes are coming to Boundary Channel Drive and the I-395 interchange near Crystal City.

The modifications include a shared-use walkway, pedestrian and bicycle access to the yet-to-open Long Bridge aquatics center, and reduction of four lanes to two.

On Saturday, the Arlington County Board voted to endorse the $20.4 million Virginia Department of Transportation project. It was part of the consent agenda, meaning they are non-controversial and can be acted upon by a single vote.

“We’ve long sought these improvements,” said County Board Chair Matt de Ferranti at the meeting. “They will reconfigure the interchange that you see to make it work a lot better and safer for everyone.”

Major components include adding roundabouts on each side, as well as building a 12 foot shared path that connects to the Mount Vernon Trail, the Long Bridge Park esplanade, and a new loop that goes around the aquatics center. Also along Boundary Channel Drive, there’ll be 8 foot wide sidewalks, landscaping, crosswalks, and street lighting.

A public hearing was held in November where, according to the county report, the public “expressed strong support for the project.”

Much of the feedback revolved around the shared-use path, making sure it was wide enough to accommodate both pedestrians and bicyclists safely. There were also a number of comments about the crosswalks and proposed safety measures.

The project is funded by a combination of state, federal, regional, and county money. Construction is expected to start in spring 2022 and be completed in fall 2023.

Construction of the Long Bridge Park Fitness and Aquatic Center, meanwhile, is still expected wrap up later this year, according to the county website. The upcoming FY 2022 county budget will decide when it ultimately opens to the public.

Image via VDOT


(Update at 8:05 pm) The Arlington County Board will vote on Saturday to expand the partnership with Virginia Hospital Center for administering COVID-19 vaccines to the public.

The memorandum of understanding lays out how VHC would manage the online appointment system, operate vaccination clinics, bill insurance, and provide individuals with their proof of vaccination, on behalf of the county.

In turn, Arlington County agrees to order the vaccine from the state at VHC’s request, provide adequate location and space for the clinics, and manage a call center for those unable to make an appointment online.

The agreement would be retroactive to January 13.

County Manager Mark Schwartz recommends the approval and ratification of this agreement, which would also allow him to decide the location of such clinics and make similar agreements “with other entities for provision of space for pop-up vaccination events, consistent with the terms of the template MOU.”

While this agreement does not specify the locations of the clinics, community centers, school auditoriums, and pharmacies have all been discussed as possibilities. The Pentagon parking lot, however, likely will not be the site of a county vaccination clinic, according to Arlington’s health director.

VHC and the county announced a partnership agreement earlier this month for a vaccination clinic for residents over the age of 75.

However, as of Thursday (Jan. 21), VHC has closed scheduling for vaccinations. Today, the hospital posted the following update.

The Virginia Department of Health (VDH) announced that going forward, disbursements of vaccines will go only to local health districts. Hospitals in Virginia will no longer receive vaccines directly from VDH.

As a result of this change, Virginia Hospital Center must cancel all future first dose appointments at our community vaccine clinics, including the Walter Reed Community Clinic and the VHC Physician Group clinic beginning with appointments that are scheduled for Jan. 26, 2021 and thereafter.

This change does not affect those receiving a second dose. If you already received your first dose at the VHC Physician Group or a VHC-run community vaccine clinic, you will still receive your second dose at the same location on your originally scheduled date and time.

The agreement that will be voted on will cover the over 75 vaccine clinic and other existing efforts, as well as additional clinics and administration tasks going forward, according to Ryan Hudson, the acting public information officer for the Arlington County Public Health Division.

“Arlington County is prepared to ramp up and expedite appointments as soon as the County receives additional doses from Virginia,” he wrote in an email to ARLnow.

Arlington County has faced criticism in recent days for the slow rollout of vaccines and an appointment system not working as promised. County officials have also previously said that all the necessary tasks needed to vaccinate Arlington residents would put a huge administrative burden on staff.

A constant refrain from County officials is that the Virginia Health Department is not providing enough vaccine doses to the county, which is slowing efforts. Other Northern Virginia localities have expressed similar complaints about a lack of vaccine supply from the Commonwealth.

The pace of vaccinations in Arlington has been quickening, nonetheless.

The current seven-day moving average of vaccine doses administered in Arlington is currently 545 per day, according to an ARLnow analysis of state health department data. As of Friday morning, a total of 8,385 doses have been administered and 735 people have been fully vaccinated, with two doses about one month apart.

Coronavirus cases in Arlington, meanwhile, have slowed after peaking ten days ago. The current seven-day moving average of new COVID cases in the county is 83 cases per day, down from 123 cases per day on Jan. 12.

A total of 26 COVID-related hospitalizations and nine deaths have been reported over the past week.

Screenshot from VHC video


The Arlington County Board is slated to review plans for two residential towers at 1820 N. Fort Myer Drive that include substantial affordable housing contributions.

The proposal from Arlington-based Snell Properties would replace the Ames Center office building across from the Rosslyn Metro station. A south tower will abut the Hyatt Centric hotel and a north tower will surround the existing Arlington Temple United Methodist Church and Sunoco gas station, dubbed “Our Lady of Exxon.”

Although the church and gas station will be “redeveloped in place,” the skywalks — which provide an elevated pedestrian connection to the Metro station — will be demolished, according to the County.

Along with plans for the Holiday Inn and the RCA building, the proposal from Snell will further change Rosslyn’s skyline, demolishing the existing building, formerly occupied by the Art Institute of Washington.

The proposed towers, 30 and 31 stories tall, include 740 multifamily units and about 10,146 square feet of retail space. Up to 225 of the residential units may devoted to an interim hotel use, while the apartments are leased.

In a report, staff highlighted the affordable housing units in the building, committed as such for the next 30 years.

“The Rosslyn Coordinated Redevelopment District area, where this project is located, is one of the most expensive rental markets in the County,” staff said. “There are currently no [committed affordable units] within the RCRD.”

Twenty-four one- and two-bedroom units will be reserved for households making up to 80% of the Area Median Income.

Typically, such units are reserved for those who make up to 60% AMI, but staff said Rosslyn is so expensive that reserving units for up to 80% AMI “will better leverage the community benefits value while providing much-needed affordability directly in this area.”

Snell Properties is also committing nearly $2.5 million in cash toward affordable housing. The County said this sum could create about 29 units in future developments that are affordable for households earning up to 60% of the Area Median Income.

The project additionally includes a $5 million cash contribution for the Fort Myer Drive tunnel project, which includes plans to convert the road into a two-way street, remove the tunnel, widen sidewalks and add protected bike lanes.

A cement plaza will separate the two towers and form one segment of a planned pedestrian pathway that County planners call the “18th Street Corridor.” This street-level walkway will replace the existing, elevated passages. Mid-block crosswalks will join the plaza to 18th Street N.

Those who participated in community engagement from July and September “were universally in support of [the] removal of both skywalks,” staff said.

The towers will share four levels of below-grade parking and the south tower will have four levels of above-grade parking — 574 parking spaces in total.

The County said “there are no outstanding community issues” but the mechanical penthouse roof and elevators may block or hurt the view of D.C. from the Central Place Observation Deck.

The south building will be built in phase one, along with an interim open space and other streetscape improvements. The second phase will see more activity: construction of the north tower, the plaza and remaining streetscape improvements, as well as the removal of the skywalks.

The County Board is expected to review the project at its Saturday meeting.


View More Stories