An open house will be held tonight to discuss the next big step in the development of Long Bridge Park: a planned aquatics and fitness center.

County staff, members of the project’s design team and the Long Bridge Park Design Advisory Committee will be on hand to give information and take questions from residents. Feedback is also welcome.

The Aquatics, Health and Fitness facility is expected to be built in two phases. A concept plan posted on the county’s website lists features of the proposed facility like cardiovascular and weight training equipment, an Olympic sized pool, a hot water therapy pool, a play area with slides and a lazy river.

Building the first phase of Long Bridge Park cost $31 million, and the aquatics facility is anticipated to cost around $50 $70 million. If bond funding is approved this year, construction on the aquatics and fitness center could begin as soon as next year and the facility could open by 2015.

The open house is tonight from 7:00-9:00 p.m. at the Fairlington Community Center (3308 S. Stafford Street).


Traffic headaches consistently top the list of complaints by local residents. The state recognizes the trouble and is gathering public input in an effort to come up with viable transit solutions.

The Virginia Department of Rail and Public Transportation has launched a study, called the Super NoVA Transit/Transportation Demand Management (TDM) Vision Plan, examining transit in Northern Virginia. It evaluates issues such as commuting patterns and projected travel demand for what is considered one of the most congested areas in the entire state.

The study will look at possible enhancements for transit and provide a vision for improving mobility throughout the region without increasing the number of vehicles occupied by only one person. When completed in the fall, the study will lay out short-term strategies along with long-term solutions through 2040.

Meetings are being held throughout Northern Virginia to explain the study and collect public input. DRPT will hold an open house on Tuesday at the Crystal City Shops from 11:30 a.m. to 1:30 p.m., in front of the Rite Aid Pharmacy (1671 Crystal Square Arcade).

An online survey is also available until March 1 for those who cannot attend the open house but would like to give feedback.


In mere days, anyone looking to dive into a new exercise routine for the new year will have another option. The Yorktown Aquatic Center is set to open on Sunday.

The facility replaces Yorktown’s older pool that had been in use for decades. Visitors now have access to an eight-lane competition pool and a separate instructional pool. There’s also a separate diving area with two springboards and a scoreboard. At least 175 people can overlook the pools from the spectator area. The facility also houses a “wet classroom” which will be available to rent for pool parties.

Sunday’s grand opening open house celebration will run during normal facility hours, from 12:00 p.m. to 6:00 p.m. You can get the full operating schedule here. The pool is located on the Yorktown Boulevard side of campus, and can be accessed from the parking area on 28th Street.