Enhanced crosswalks and curb extensions are coming to S. Walter Reed Drive, just south of Columbia Pike, in an effort to calm traffic and improve intersections for pedestrians and bicyclists.
Storm sewer upgrades and raised medians will also be added to the stretch of S. Walter Reed Drive between 11th Street S. and 13th Street S. The current “bike boulevard” will move from 12th Street S. to 11th Street S. between S. Highland Street and S. Cleveland Street.
County Manager Mark Schwartz has recommended awarding the project to Fort Myer Construction, headquartered in Washington. The County Board is scheduled to consider the contract at its Saturday meeting. The contract cost is $444,575.11, with a change order contingency allocation of $88,915.02.
The emergency lights are on at the Pentagon City Metro station’s underground pedestrian tunnel, but nobody’s there.
The third entrance to the Metro station is still closed despite an Arlington County staff report scheduling a March 2017 opening. The tunnel is now supposed to open sometime this spring, wrote Catherine Matthews, communications specialist for the county’s Dept. of Environmental Services, to ARLnow.com via email.
The pedestrian tunnel connected to the Metro is located at the northeast corner of the intersection of S. Hayes Street and 12th Street S. The tunnel opening was initially scheduled for 2015.
The county made an agreement last year with WMATA to claim responsibility for maintaining and operating the $1.3 million tunnel.
“Over the past year the connection, operations and maintenance agreement with WMATA has been amended and a separate letter agreement with Brookfield Office Properties has been executed; specifically to confirm and finalize procedures for the opening and closing of the tunnel each day,” Matthews said.
WMATA and Brookfield Office Properties are responsible for finalizing the procedures for opening and closing the tunnel, according to Matthews, and once that has been done the tunnel will open, she added.
When it does open, the tunnel will be available to pedestrians weekdays from 7 a.m. to 6 p.m.
A 60-year-old man suffered non-life-threatening injuries after being struck by a car on Washington Blvd earlier today (Tuesday) near Washington-Lee High school.
A driver in a white SUV struck the man just before 10:30 a.m. at the intersection of Washington Blvd and N. Stafford Street. According to scanner traffic, he had a head wound but was conscious, and was attended to by nearby construction workers before police and medics arrived.
Officers from the Arlington County Police Department canvassed witnesses nearby but did not close any roads, and traffic appeared to be flowing as normal.
Washington Blvd has had well-documented issues with pedestrian-vehicle conflicts in recent years, despite various safety improvements being installed. A teen was struck by a car in 2016 at its intersection with N. Utah Street and suffered a serious head injury.
A shared-use path is now open on eastbound Washington Blvd near the Pentagon, part of a bridge rehabilitation project in Arlington County.
The Virginia Department of Transportation said a 14-foot wide path for bicycles and pedestrians along eastbound Washington Blvd (Route 27) over Route 110 opened yesterday (Tuesday).
The path is now 14 feet wide on the bridge and replaces a narrow concrete sidewalk that pedestrians and cyclists used to use. It is 10 feet wide on the approaches to the bridge.
Drivers in the area can expect some delays starting tonight (Wednesday), as eastbound traffic on Washington Blvd will shift onto the newly-constructed portion of the bridge. The traffic shift allows construction crews to demolish the middle portion of the bridge and rebuild it.
Work is expected to last from 10 p.m. tonight until 5 a.m. tomorrow (Thursday). Drivers are advised to seek alternate routes.
VDOT said it still believes the $31.5 million project is on track to wrap up next year. It will replace the existing bridge, built in 1941, with one that is wider, longer and taller.
A bill in the Virginia State Senate would require that drivers come to a complete stop when yielding to pedestrians crossing the street.
The bill, SB 46 introduced by state Sen. Barbara Favola (D), adds language to state law telling motorists what constitutes yielding to a pedestrian: “by stopping and remaining stopped until such pedestrian has safely crossed,” per the bill text.
Favola’s bill would require drivers to stop and remain stopped at the following places:
Clearly marked crosswalks, whether at mid-block or at the end of any block.
Any regular pedestrian crossing included in the boundary lines of the adjacent sidewalk at the end of a block.
Any intersection when the driver is approaching on a highway where the maximum speed limit is 35 miles per hour.
Language on when drivers must yield to pedestrians is included in the Virginia Criminal and Traffic Manual, but does not include the line to have drivers stop.
“Under this bill, a car would have to stop. Right now all you have to do is yield,” Favola told ARLnow.com. “So if a pedestrian is crossing and is on one half of the crosswalk, a car can go through the other half. This would make them stop completely.”
Favola’s district includes sections of Arlington County. The new legislation comes on the heels of a recent enforcement effort by the Arlington County Police Department, during which officers cited more than 30 motorists at severalintersections for failing to yield.
The bill would not change the fines for violations: $100-$500 when street signs require drivers to yield and no more than $100 at crossings with shared-use paths like trails.
The Arlington County Police Department cited 20 drivers yesterday (Thursday) on Columbia Pike for failing to yield to pedestrians, as part of an active enforcement effort.
Officers stationed themselves at the intersection of Columbia Pike and S. Oakland Street in Alcova Heights and an officer in a bright orange shirt crossed the street as cars in the distance started to approach. ACPD spokeswoman Ashley Savage said they cited 20 people for failing to yield.
The enforcement effort is part of its 2017 Street Smart Pedestrian, Driver, and Bicyclist Safety Campaign. A similar enforcement by police officers took place in mid-November.
The program aims to change road users’ behavior while reducing the number of crashes and injuries. Officers ticketed motorists, bicyclists and pedestrians who violated traffic laws.
It’s a beautiful day to #BeStreetSmart. ACPD conducting high-visibility traffic enforcement at the intersection of S. Oakland and Columbia Pike. Proceed with care and caution for the safety of all travelers. pic.twitter.com/BSiJiGrtcS
The ultimate goal of today’s high-visibility traffic enforcement campaign is compliance with the law, even when police are not present. Slow down and yield to pedestrians in the crosswalk. pic.twitter.com/vZtNz39MUX
Drivers given a safe stopping distance of 170 feet. Our pedestrian waits for a safe break in traffic and never enters crosswalk in disregard to approaching traffic. Those that fail to yield are cited. pic.twitter.com/Wk3EhgGzv6
ACPD #StreetSmart campaign is underway at the intersection of Washington Boulevard and 4th St N. Slow down and yield to pedestrians in crosswalk. pic.twitter.com/fTuKNi62dI
Arlington County Police cited 11 drivers in two places earlier this week for failing to yield to pedestrians in crosswalks.
Department spokeswoman Ashley Savage said the tickets were issued from two locations: the intersections of Washington Blvd and 4th Street N. in Lyon Park; and Columbia Pike and S. Oakland Street in Alcova Heights.
Police said the program is part of its 2017 Street Smart Pedestrian, Driver, and Bicyclist Safety Campaign from November 6 through December 3.
The program aims to change road users’ behavior while reducing the number of crashes and injuries. Officers ticketed motorists, bicyclists and pedestrians who violated traffic laws.
Officers will conduct another high-visibility enforcement effort on November 30.
Ensuring the safety of pedestrians, cyclists and motorists and maintaining the safe flow of traffic is the primary mission of our Special Operations Section. Help us by being #StreetSmart. Tips: https://t.co/LKVAW4x01Xpic.twitter.com/kRIwqx1Jeg
Drivers who fail to yield to pedestrians in the crosswalk are cited during today’s #StreetSmart campaign. Obey the speed limit, put your phone down and drive with care and caution. pic.twitter.com/XFmez1A5XE
Drivers given a safe stopping distance of 170 feet. Our pedestrian always waits for a safe break and never enters the crosswalk in disregard of approaching traffic. #StreetSmartpic.twitter.com/pAz1KhwkRM
#StreetSmart High-Visibility Traffic Enforcement Campaign moves to Columbia Pike at S. Oakland. Officers are measuring the safe stopping distance. pic.twitter.com/K24gsQwxr3
Construction to expand a federal training facility has closed a walking trail near Alcova Heights Park.
The trail between 6th Street S. and S. Quincy Street closed permanently yesterday for construction on the State Department’s National Foreign Affairs Training Center (4000 Arlington Blvd).
NFATC trains members of the nation’s foreign service, and is seeking to expand its campus in Arlington to include a new training and classroom facility, childcare center and other buildings. The project is expected to be completed in October 2018.
As planned, the expansion would extend the perimeter fence farther south, and, in the process, swallow up a pedestrian path that connects George Mason Drive and S. Quincy Street.
Starting today, the trail between 6th St S and Quincy St S will be closed for construction at the National Foreign Affairs Training Center. More Details: https://t.co/RfRqGCfD81pic.twitter.com/C5Zu2EpRGs
The decision to close the path came under fire earlier this year from local residents, who signed a petition to try to save it. At the time, critics said pedestrians would be deprived of a way to walk from one end of the Alcova Heights neighborhood to another.
The petition was signed by more than 130 people and urged the General Services Administration, which is responsible for the project, to “build a perimeter trail connecting 3rd St. S to the existing trail at Quincy at 6th St. S,” among other demands.
The findings of a study on the feasibility of a pedestrian link between Crystal City and Reagan National Airport are set to be unveiled at a public meeting Wednesday.
The Crystal City Business Improvement District and civil engineering firm VHB will host a public meeting from 1-2:30 p.m. and again from 6:30-8 p.m. on November 15, on the 11th floor of 2011 Crystal Drive.
There, they will present the findings of a feasibility study on the project commissioned earlier this year, as well as several renderings of possible pedestrian links.
Those unable to attend can watch the presentation on Facebook Live, while the presentation slides will be uploaded to the project website after the meeting.
Crystal City BID CEO Angela Fox has said previously that a “new pedestrian connection will bring the airport even closer, from a 15-minute walk to a four-minute walk.”
ACPD Urges Caution on Roads As Days Get Shorter — “The days are getting shorter and there’s increased pedestrian and bicyclist traffic after dark,” the Arlington County Police Department said in a public service tweet last night. “Slow down, remain alert and proceed with care and caution.” [Twitter, Twitter]
History: Fort Myer During World War I — A Library of Congress collection includes 100-year-old photographs showing what life was like on Fort Myer during World War I. The photos show a visit from President Woodrow Wilson and the famous “Three Sisters” radio towers. [Pentagram]
Redskins Visit Fort Myer, Play Video Games — Former Washington Redskins players Santana Moss and Fred Smoot visited Joint Base Myer-Henderson Hall and engaged in a Madden 18 video game tournament with some of the men and women in uniform. [WUSA 9]
Notable Tree Nomination Deadline Approaching — November 15 is the application deadline for submitting a tree for consideration as a 2018 Arlington County “notable tree.” [Arlington County]
Arlington County will spend just over $640,000 to re-configure an intersection in Courthouse neighborhood.
The County Board unanimously approved the construction project at its meeting Saturday.
The plan is to remove a one-way portion of roadway that serves as a shortcut to 15th Street N. in front of county government headquarters, and instead have Clarendon Blvd traffic access 15th Street via a 90 degree turn at the traffic signal-equipped intersection a bit farther down the road.
As currently configured the triangle of roadway leads to conflicts between cars and pedestrians, county staff says. The goal of the project is to improve “pedestrian safety, circulation and access in and around Courthouse Plaza.”
The new intersection will include additional trees, green space and other amenities for pedestrians and bicyclists.
More from a county press release:
Clarendon Boulevard is a key arterial street in the R-B corridor, and the intersection of 15th Street is central to the busy Courthouse Metro Station. The intersection is currently designed primarily to funnel automobiles onto 15th Street North, which often results in conflicts between pedestrians, vehicles and transit users.
New safety and streetscape improvements, which will include new concrete curb and gutter, ADA compliant sidewalks, storm structures and streetscape amenities, such as benches and bike racks, will make this area safer for all travelers. The project also will improve the circulation of the Courthouse Plaza parking garage and provide better access to the surrounding street network by extending the parking garage’s entrance to Clarendon Boulevard. The bus stop waiting area along 15th Street North will be expanded and the existing bus stop at Clarendon Boulevard/N. Wayne Street will be relocated to the far right of the intersection to facilitate safer pedestrian crossing along this street segment.
“These are the kinds of projects that make Arlington such a great place to walk,” County Board Chair Jay Fisette said in a statement. “This intersection is going to function better for all who use it – and look a lot better – as a result of the improvements the Board approved today.”
Photo (1) via Arlington County, photo (2) via Google Maps