Arlington County is applying for regional funding to run buses every six minutes between Fairfax County and Amazon’s second headquarters in Pentagon City during peak hours.

The Arlington County Board on Saturday authorized staff to apply for up to $8 million in Northern Virginia Transportation Commission funding. Funding would offset the operating costs associated with running 10 buses per hour during peak times for two years along a new Metrobus route dubbed the 16M, connecting the Skyline complex in the Bailey’s Crossroads area of Fairfax County down Columbia Pike, to Pentagon City and Crystal City.

The report suggests that the county is preparing for an increase in ridership after the opening of the first phase of Amazon’s HQ2, despite work from home trends.

“The 16M service will provide a direct connection to Amazon HQ2 with its first phase of construction (2.1 million square feet of commercial space) coming on-line in Summer/Fall 2023,” per a county report. “This service will also take advantage of the recently built portions of Columbia Pike and [eight] new transit stations located on Columbia Pike.”

But recommendations to increase frequency along this route date back well beyond Amazon’s decision to move into Arlington, says Dept. of Environmental Services spokeswoman Claudia Pors.

She says the request acts on a 2016 study, which “recommended creating a route connecting Skyline with Crystal City through Columbia Pike in anticipation of growth in Crystal City.” That followed the cancellation of the Columbia Pike streetcar project, which would have followed largely the same route.

“The study evaluated ridership forecasting, current service patterns, like bus and seat availability, and travel patterns, like trip lengths, ridership rates and traffic volume in the area to make the recommendation to increase frequency,” Pors said.

Sometime this spring, the new 16M route will begin revenue service with a base frequency of buses every 12 minutes during the service day.  The new route will replace existing 16G/H service.

Pors said the average weekday ridership for the last four-and-a-half years along the 16G/H line peaked at a little over 4,500 average weekday riders before Covid, and is now about 60% recovered compared to pre-pandemic levels.

(more…)


Work to rebuild Army Navy Drive through Pentagon City and improve safety and transit along the corridor is officially underway.

This morning, Arlington County and the Northern Virginia Transportation Authority ceremonially broke ground on the long-planned Army Navy Drive “Complete Street” Project, which is intended to make the current multi-lane expanse of Army Navy Drive between S. Joyce Street and 12th Street S. more friendly to pedestrians, cyclists and transit users.

The project includes shortened pedestrian crossings, dedicated transit lanes between S. Joyce Street and S. Hayes Street, planted medians, new traffic signals at five intersections, and in some places, narrowed or reduced vehicle travel lanes. There will be a protected, two-way bicycle lane along the south side of Army Navy Drive.

Work kicks off as the number of workers and residents in the area is projected to significantly increase in the coming years. Amazon is preparing to build the second phase of its HQ2 — known as PenPlace, and which includes the iconic “Helix” building — at the corner of Army Navy Drive and S. Eads Street, while continuing to hire toward its goal of 25,000 employees. Meanwhile, JBG Smith has filed plans to add 1,668 residential units to surface parking lots at the nearby RiverHouse complex.

For the next three weeks, road users will see signs of crews setting up for the Army Navy Drive project, like cones and a construction management trailer, says Mark Dennis, project manager for Arlington’s Dept. of Environmental Services. In mid-November, people will start to see demolition work.

“Both sides of the corridors will have markings and indicators that the entire area is a working construction zone,” Dennis told ARLnow. “There will be slight changes in traffic patterns to accommodate lane shifts that are needed.”

He said drivers will need to pay extra attention to navigate these changes.

“Complete Streets” project plan for portion of Army Navy Drive (via Arlington County)

Before scooping ceremonial dirt with gold-colored shovels, local and regional dignitaries celebrated the expected benefits of the project.

Arlington County Board Chair Katie Cristol said the project will make Army Navy Drive safer for pedestrians and cyclists and more convenient for bus riders. It will also slow down drivers, improve air quality and reduce stormwater runoff, she said.

“It’s better for all of us because providing safe, accessible and multimodal transportation is a key part of the economic competitiveness of Pentagon City and Arlington overall,” said Cristol.

NVTA CEO Monica Backmon celebrated the project for “getting people out of their single-occupancy vehicles and giving people options.”

https://twitter.com/NVTAuthority/status/1584554450823544832

The transportation authority said in a press release that it has invested more than $227 million into transportation projects located in Pentagon City, Crystal City and Potomac Yard, known collectively as National Landing.

(more…)