Takeshi Sushi — a new Japanese restaurant at 2424 Wilson Blvd — is planning an opening sometime in May.

Owner Wu Lin said the restaurant is planning to offer sushi, ramen, and other Japanese food in a quick-service style eatery.

The new restaurant is located next to Delhi Dhaba Indian Restaurant and under Arlington Rooftop Bar and Grill. Takeshi Sushi is replacing a Subway that closed in November.

Lin said the restaurant is his first location, but they are planning to simultaneously open another Takeshi Sushi in the Fairfax Circle Shopping Center, in the Fairlee neighborhood of Fairfax.


Quarterfest presented by Dittmar is coming to Ballston on May 18 and 19.

From 12-6 p.m. each day, this festival continues Ballston’s tradition of giving back, as a charitable event of BallstonGives, and invites visitors to sip, sample, shop and savor the best that Ballston has to offer!

Located on Wilson Boulevard near the Ballston/MU metro station, and directly in front of the newly redeveloped Ballston Quarter — an entertainment and dining destination, the festival will feature a Quarterfest Crawl on Saturday, Curbside Kitchen‘s Food Truck Alley on Sunday, street pub all weekend serving up craft brews, wine and specialty cocktails, and a free concert.

New to the neighborhood, the Quarterfest Crawl will allow festival-goers to explore the neighborhood, sampling “tastes” at each participating venue with purchase of a Quarterfest Crawl wristband.

Food crawl venues include established Ballston favorites such as SER and Mussel Bar, and neighborhood newcomers DIRT, True Food Kitchen, Punch Bowl Social and more. Additionally, the Crawl wristband entitles visitors to exclusive retail discounts and giveaways of experiential activities at Cookology and 5 Wits, plus two free drink tickets to use at the street pub.

The festival and concert are free and open to the public, but festival-goers will need a wristband and drink tickets to savor the food and drink experience at Quarterfest. Tickets and wristbands are now on sale at “early bird” pricing until May 1.

You can find out more about Quarterfest Crawl locations and what will be coming to Ballston May 18 and 19 at https://www.quarterfestballston.org/.


The front entrance to Ballston Quarter mall and its Quarter Market food hall is closed after a cable broke on a piece of scaffolding.

A large fire department response to the Wednesday afternoon incident temporarily blocked Wilson Blvd in front of the mall, but the road has since reopened.

Two workers who were on the equipment at the time of the accident were able to climb to safety with the help of firefighters. No injuries were reported.

Police have roped off the entrance until the scaffolding can be secured.


(Updated at 12:20 p.m.) Wilson Blvd is closed between N. Quincy and Randolph streets, just east of Ballston Quarter mall, for the removal of a massive construction crane.

Crews appear to be in the process of disassembling the crane piece-by-piece and hauling away the pieces.

Police are on scene and traffic is being re-routed to roads parallel to Wilson. As of 11 a.m., traffic was light in the area. The westbound lanes of Wilson are expected to reopen in time for the evening rush hour, according to Arlington County Police spokeswoman Ashley Savage, while the eastbound lanes are set to remain closed through Sunday.

The crane was in place to assist with the construction of the new Liberty Center building at 4040 Wilson Blvd.

The mixed-use residential, retail, and office space is scheduled to open later this year and will be the final piece of a five-building development. VIDA Fitness, a “high end fitness center and spa,” is set to open its first non-D.C. location in the building by the end of 2019, while publicly-traded apartment developer AvalonBay is expected to move from its current Ballston office to the new building.

The road closure is not the only notable closure on the block. The Sweetgreen restaurant at 4075 Wilson Blvd is closed for the second day in a row, for unspecified reasons. Some sort of a clean-up effort appears to be underway in the store, though a county spokesman noted that the temporary closure is “not related to any Health Department action.”


GW Parkway ClosureUpdated at 9:15 a.m. — “All lanes of the GW Parkway are now closed during Friday morning’s rush hour due to a large sinkhole that was discovered overnight.” [Tysons Reporter]

HQ2 Impact to Be Bigger Than Expected? — JPMorgan’s Jamie Dimon and George Mason University’s Stephen S. Fuller both think many are underestimating HQ2’s impact on job creation in the region. [Washington Business JournalWashington Business Journal]

Arlington Gets High Marks for Dog Parks — Arlington is No. 10 on the Trust for Public Land’s ranking of cities with the most dog parks per capita. Arlington has eight dog parks, or 3.5 for every 100,000 residents. D.C. ranked No. 22 on the list. [Trust for Public Land]

Wilson Blvd to Close Again in Ballston — “That stretch of Wilson Boulevard at @BallstonQuarter that’s now closed eastbound on school nights 8pm-6am for 8 weeks? It’ll also be closed both ways this weekend, Friday 8pm to Sunday 6pm. Lots of pedestrian bridge to do.” [Twitter]

Road Closures in N. Arlington — “The Nottingham/Discovery Elementary Schools 5K race will take place on Saturday, March 23, 2019. The Arlington County Police Department will close several roads from approximately 7:00 AM to 10:00 AM to accommodate the event.” [Arlington County]

Basketball Fundraiser Tonight — “New Directions High School students will play Arlington County’s heroes — including some of the police department, fire department, probation and prosecutor’s office” tonight at Hoffman-Boston Elementary School to raise money for New Directions. [Twitter]

No Hyperloop for Va. for Now — “Virginia transit officials flew to California to check out Elon Musk’s Boring Co. tunnel. They say they’re gonna stick with traditional roads and railways for now. ‘It’s a car in a very small tunnel.'” [Virginia Mercury, Twitter]


A new Vietnamese restaurant is now open in Rosslyn.

Saigon Noodles and Grill, located at 1800 Wilson Blvd, has posted banners proclaiming the eatery’s “grand opening.”

The restaurant first put up signs at the space last month. The eatery replaces Bistro 360, a wine shop and eatery that closed last May after about four years in Business.

According to its website, Saigon Noodles and Grill will be open all seven days a week, from 10 a.m.-10 p.m.

Its menu includes pho, banh mi and a whole host of other Vietnamese dishes.

https://twitter.com/RosslynVA/status/1085613922290487296


A masked man tried to abduct a woman outside of her residence along Wilson Blvd this past weekend, according to Arlington County Police.

The abduction attempt happened early Saturday morning on Wilson near the intersection with Patrick Henry Drive. The man tried to drag the woman away but she fought back and the attacker eventually fled.

More from this week’s Arlington County Police Department crime report:

ABDUCTION, 2019-01120041, 6100 block of Wilson Boulevard. At approximately 3:00 a.m. on January 12, police were dispatched to the report of a suspicious person. Upon arrival, it was determined that the female victim was walking in the area when she noticed an unknown male subject following her. As she approached the entrance to her residence, the male suspect pulled the victim’s hair from behind and wrapped his arms around her, preventing her from leaving. The suspect attempted to pull the victim away from her residence, however she resisted and the suspect eventually fled on foot when a vehicle drove by the area. The suspect is described as a Hispanic male, with light-olive toned skin, possibly in his late 20’s or early 30’s, approximately 5’8″-5’11”, 150-180 lbs., wearing black pants, a black jacket, black shoes and a winter mask. The investigation is ongoing.

Also last week, police were dispatched to a store in Pentagon City for a man who exposed himself to a group of children inside a fitting room.

The incident happened Friday night, on the 1100 block of S. Hayes Street — which is address of both the Fashion Centre at Pentagon City mall and the Pentagon Centre shopping center.

INDECENT EXPOSURE, 2019-01110259, 1100 block of S. Hayes Street. At approximately 7:11 p.m. on January 11, police were dispatched to the report of an indecent exposure. Upon arrival, it was determined that the juvenile victims were in the area of the fitting rooms inside of a business when they observed a male expose himself and touch himself inappropriately. The suspect is described as a Middle Eastern male, 25-35 years old, taller than 6’1″, approximately 190 lbs., with short black hair, brown eyes, scruff on his face, wearing a dark gray shirt, black jacket and black jeans. The investigation is ongoing.

Below are the rest of the highlights from this week’s crime report, including some we’ve already reported.

(more…)


A new round of construction is kicking off at one of Clarendon’s trickiest intersections, and that means more lane closures and traffic changes.

Starting today (Wednesday), workers plan to start major sidewalk expansions at the “Clarendon Circle” intersection, or the area where Clarendon, Washington and Wilson boulevards meet.

The county expects the widening work to last through April, with the ultimate goal of having the new sidewalks ready “in time to allow businesses to have outdoor seating during the spring and summer months.” Much of the construction centers on the intersection of Washington Blvd and N. Irving Street, the home of both O’Sullivan’s Irish Pub and The Liberty Tavern.

County officials signed off on the $2.5 million Clarendon Circle overhaul this summer, in a bid to make the intersection a bit easier to navigate for pedestrians and cyclists, in particular. In addition to the sidewalk expansions, the project will include the installation of new bike lanes, the widening of Washington Boulevard to four lanes — while nixing the current reversible lanes — and the addition of upgraded traffic signals.

The construction first started prompting major traffic changes in the area early this month, and now the county is warning of additional changes. Those include a prohibition on left turns in the following areas:

  • Northbound Wilson Boulevard to N. Irving Street
  • Northbound Wilson Boulevard to westbound Washington Boulevard
  • Southbound Wilson Boulevard to eastbound Washington Boulevard
  • Westbound Washington Boulevard to southbound Wilson Boulevard

Some portions of the sidewalk will also be closed on both the Washington Blvd and Wilson Blvd sides of N. Irving Street. The left turn from eastbound Washington Boulevard to Clarendon Boulevard also remains off-limits, and will likely be shut down through this summer.

The county is hoping to have all of the work wrapped up by sometime in 2020, weather permitting.

The project is designed to move in conjunction with the county’s plans to do away with the reversible lanes on Washington Boulevard and create a “T” intersection with 13th Street N. That construction is projected to kick off sometime this winter, after the county cleared the way for the redevelopment of the nearby Red Top Cab properties.


The county could soon get started on some eagerly awaited improvements to Wilson Blvd in Virginia Square this spring.

Between 2009 and 2012, Arlington County completed two previous phases of road construction from N. Quincy Street to N. Lincoln Street, adding new sidewalks, streetlights, trees, bus shelters and a traffic signal at Oakland Street.

The second phase was divided into two different areas, with the first one finished in 2010 and the second one in 2012.

Now, last part of the project has been split into “east” and “west” phases along N. Kenmore Street.

The County Board is now set to award Sagres Construction Corp. a contract and $1,084,766 for the work needed for the “west” portion between N. Monroe Street and N. Kenmore Street. Construction could then begin next spring and then wrap the following summer.

For the final section, which spans from N. Kenmore Street to 10th Street N., construction is expected to start in spring of 2020 and then finish in spring of 2021.

Project elements for both “east” and “west” include new curbs and gutters, ADA-compliant sidewalks, traffic signal improvements, Carlyle-style streetlights and trees along the street. Upgrades to the storm sewers and new asphalt paving, signing and markings will also happen, according to the county.

“During the conceptual design process, residents especially noted concern for providing a safe pedestrian crossing at the N. Kenmore Street intersection,” according to county documents.

The Board is set to approve the contract at its meeting Saturday (Dec. 15) as part of its consent agenda, which is generally reserved for noncontroversial items.

Map via Arlington County


The construction of a new pedestrian bridge linking Ballston Quarter to the area’s Metro station is picking up steam.

Workers recently began installing supports for the bridge near the development’s entrances along Wilson Blvd, as well as near the “Ballston Exchange” development at 4201 Wilson Blvd, where the walkway will ultimately connect.

The frame for a new bridge is also taking shape in nearby Mosaic Park, where Ballston Quarter developer Forest City secured permission to start assembling the structure through a deal with county officials.

After tearing down the old bridge over Wilson Blvd last May, Forest City originally planned to have the new walkway ready by the time shops first started opening in the newly renovated Ballston Common mall.

But they reported to the county this summer that construction delays were hampering the process, targeting sometime in 2019 instead. As the new year approaches, a spokeswoman for Forest City says that the bridge is “still slated to deliver in the spring of 2019.”

Forest City has until the end of the month to wrap up work in Mosaic Park under the terms of its current deal with the county. However, the company does have the chance to secure a two-month extension for additional work through the end of February, though that’s contingent on the construction not disrupting the long-awaited overhaul of the park set to start this coming spring.

When the bridge is finished, it’s designed to connect the Ballston Metro station seamlessly to the Ballston Quarter development, helping pedestrians avoid crossing a bevy of busy streets.


Crews have broken ground on the first phase of the “Clarendon Circle” project, bringing improvements to one of the county’s trickiest intersections for pedestrians and cyclists but creating some temporary traffic changes.

The County Board approved in June the contract for the overhaul of the “Clarendon Circle” — the area where Clarendon, Washington and Wilson boulevards all meet, just past the Metro station.

The first phase of the project involves concrete work along eastbound Washington Blvd — west of Wilson Blvd and Fairfax Drive — along with removal of the existing curb and gutter in the area.

Ardent Construction Company began in September Clarendon Circle’s reconstruction, which is anticipated to last one year, according to the county.

Signs will provide detour directions. Drivers and pedestrians have the following options to Clarendon Blvd from Washington Blvd:

  • Turn right on southbound N. Kirkwood Road, which turns into 10th Street N. Then turn left on Wilson Blvd and continue straight.
  • Stay on Washington Blvd, crossing Wilson and Clarendon boulevards, and then turn left on N. Highland Street. Then turn right.

Additionally, left turns will be restricted on eastbound Washington Blvd along with the left turn from eastbound Washington Blvd to Clarendon Blvd through next summer.

Traffic disruptions with lane and sidewalk closures during the 9 a.m. to 4 p.m. work hours on Mondays through Fridays are expected, the county said, adding that no weekend work is scheduled.

The planned improvements address planners’ desired changes to the intersection, like shortening the distances pedestrians have to walk across roads. The work will also include long-anticipated installation of additional bike lanes, the widening of Washington Blvd and the addition of upgraded traffic signals.

The project will also add a “green streets” element to N. Irving Street, next to the Silver Diner, which planners have said will help better manage stormwater.

Additional plans for the project include installing new Carlyle streetlights, adding curb extensions at the Liberty Tavern corner and planting more trees.

Maps via Arlington County


View More Stories