News

Road Work in Progress on Arlington Ridge

The slip lane from Arlington Ridge Road to Meade Street — the primary focus of a neighborhood fight over a pedestrian safety improvement project — is no more.

The lane has now been demolished by construction contractors, who are in the process of building a wider sidewalk, additional green space and circular driveways for two houses. Daytime traffic on Arlington Ridge Road has been reduced to one lane near the construction zone, with flaggers directing cars on either side. The sidewalk along the east side of Arlington Ridge Road near the construction has been closed.

In addition to the work in progress — eliminating the Meade Street slip lane and making the intersection a purely 90 degree turn — the $200,000 county project has already turned the bus pull-off lane south of 23rd Street into an expanded sidewalk and has squared up the intersection of Arlington Ridge and Oakcrest Road by extending the permanent curbing to where a temporary curb had been installed.

Save Our Streets, a group that formed to oppose the construction, says the money could have been better spent.

“We all watch with a sense of disbelief. Why would the County waste this much money for fixing a non-issue with Meade Street intersection which has no reported accidents?” the group said on its blog. “We need this money for our schools, our poor, our libraries, our roads… not on projects that go way beyond what people want.”

Author

  • Launched in January 2010, ARLnow.com is the place for the latest news, views and things to do around Arlington, Virginia. Started by a Pentagon City resident who has spent the past several years working in local TV news, ARLnow.com seeks to distinguish itself with original, enterprising, up-to-the-minute local coverage.

    View all posts